Publications
Deterioration of UWB positioning during construction. Automation in Construction, 24, 72-80. Retrieved from
. (2012). Risk management for design and construction. Construction Management and Economics, 30(8), 711-713. Retrieved from
. (2012). Dislocation detection in field environments: A belief functions contribution. Expert Systems with Applications, 39(10), 8505-8513. Retrieved from
. (2012). Target-focused local workspace modeling for construction automation applications. Journal of Computing in Civil Engineering, 26(5), 661-670. Retrieved from
. (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957-967. Retrieved from
. (2012). Using digital photogrammetry for pipe-works progress tracking. Canadian Journal of Civil Engineering, 39(9), 1062-1071. Retrieved from
. (2012). Construction small-projects rework reduction for capital facilities. ASCE Journal of Construction Engineering and Management 138 (12), pp. 1377-1385.
. (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering 39 (9), pp. 957-967.
. (2012). Activity Analysis in Industrial Construction. ASCE Journal of Construction Engineering and Management, 137(12), pp. 1117-1124.
. (2012). Automated Progress Tracking Using 4D Schedule and 3D Sensing Technologies. Automation in Construction 22 , pp. 414-421.
. (2012). Construction small-projects rework reduction for capital facilities. Journal of Construction Engineering and Management, 138(12), 1377-1385. Retrieved from
. (2013). Investigation of the effects of air temperature and speed on performance of piezoelectric weigh-in-motion systems. Canadian Journal of Civil Engineering, 40(10), 935-944. Retrieved from
. (2013). Tracking secondary and temporary concrete construction objects using 3D imaging technologies. In Computing in Civil Engineering (pp. 749-756). Retrieved from
. (2013). A human body posture sensor for monitoring and diagnosing MSD risk factors. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). An integrated quality management system for piping fabrication using 3D laser scanning and photogrammetry. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). Tracking MEP installation works. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). Front End Planning Tool (FEPT) based on an electronic process management. Journal of Construction Engineering and Project Management, 3(2), 1-12. Retrieved from
. (2013). Autonomous modeling of pipes within point clouds. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013). A CONCEPTUAL APPROACH TO DISCOVERING KNOWLEDGE FROM CONSTRUCTION WORKFLOWS. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). A model for implementing & continuously improving the automated change management process for construction mega projects. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013).