%0 Journal Article %J Journal of Construction Engineering and Management %D 2021 %T Analysis of the Limits of Automated Rule-Based Ergonomic Assessment in Bricklaying %A JuHyeong Ryu %A Mohsen M Diraneyya %A Carl T Haas %A Eihab Abdel-Rahman %B Journal of Construction Engineering and Management %V 147 %P 04020163 %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0001978 %N 2 %0 Journal Article %J Automation in Construction %D 2021 %T Automated shape and pose updating of building information model elements from 3D point clouds %A Christopher Rausch %A Carl Haas %B Automation in Construction %V 124 %P 103561 %G eng %U https://doi.org/10.1016/j.autcon.2021.103561 %0 Journal Article %J Automation in Construction %D 2021 %T A computational methodology for generating modular design options for building extensions %A S. Shahi %A P. Wozniczka %A C. Rausch %A I. Trudeau %A C. Haas %X

Adaptation of existing building stock is an urgent issue due to aging infrastructure, growth in urban areas and the importance of demolition mitigation for cost and carbon savings. To accommodate the scale of implementation required, there is a need to increase the efficiency of current design and production processes. Computational methodologies have proven to increase design efficiency by generating and parsing through myriad design options based on multivariate (e.g., spatial, environmental, and economic) factors. Modular Construction (MC) is another approach used to increase efficiency of both design and production. This paper combines these approaches in a novel methodology for generating modular design options for extensions of existing buildings (an efficacious form of building adaptation). The methodology focuses on key architectural design metrics such as energy use, daylighting, life cycle …

%B Automation in Construction %V 127 %P 103700 %G eng %0 Journal Article %J International Journal of Construction Management %D 2021 %T Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing %A Christopher Rausch %A Ruodan Lu %A Saeed Talebi %A Carl Haas %B International Journal of Construction Management %P 1-14 %G eng %U https://doi.org/10.1080/15623599.2021.1896942 %0 Journal Article %J Construction Innovation %D 2021 %T Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management %A Q. Chen %A B. Adey %A C. Haas %A D. Hall %X

Purpose

The dynamic nature and complexity of construction projects make it challenging to ensure that the engineer-to-order (ETO) materials supplied onsite match changing needs. The quick and efficient communication of required changes in material fabrication, delivery and use, due to changes in the design and construction schedules, is needed to address the challenges. This study aims to provide a novel integrated management framework with its embedded informatics to help major stakeholders efficiently absorb agility during communication to deal with required changes and improve workflows.

Design/methodology/approach

An integrated management framework is developed that integrates the milestones in look-ahead plans and structured iterative processes for major supply chain stakeholders to quickly disseminate information emanating from changes in design, schedules, production and …

%B Construction Innovation %G eng %0 Journal Article %J Journal of Management in Engineering %D 2021 %T Interface Health and Workload between Stakeholders in Complex Capital Projects: Assessment, Visualization, and Interpretation Using SNA %A Ekin Eray %A Carl T Haas %A Derek Rayside %B Journal of Management in Engineering %V 37 %P 04021006 %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000891 %N 3 %0 Journal Article %J Advanced Engineering Informatics %D 2021 %T Optimizing 3D Irregular Object Packing from 3D Scans Using Metaheuristics %A Yinghui Zhao %A Chris Rausch %A Carl Haas %B Advanced Engineering Informatics %V 47 %P 101234 %G eng %U https://doi.org/10.1016/j.aei.2020.101234 %0 Journal Article %J Automation in Construction %D 2021 %T Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios %A Mansour Esnaashary Esfahani %A Christopher Rausch %A Mohammad Mahdi Sharif %A Qian Chen %A Carl Haas %A Bryan T Adey %B Automation in Construction %V 126 %G eng %U https://doi.org/10.1016/j.autcon.2021.103686 %0 Journal Article %J Journal of Construction Engineering and Management %D 2021 %T Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and NestingAuthorsChris Rausch, Benjamin Sanchez, Carl Haa %A C. Rausch %A B. Sanchez %A C. Haas %X

The need to optimize the geometry and topology of construction components and assemblies can often be framed as combinatorial optimization problems (COPs). Such COPs occur throughout construction and are particularly relevant in architectural panel systems, given the complexity of panel topology, large component quantity in most projects, and the need to reduce waste produced during fabrication. The contribution of this paper is the development of novel combinatorial optimization algorithms for unfolding and nesting panels: a process that is central to realizing a fully automated and optimized file-to-factory system. The first algorithm for panel unfolding explores both enumerative and metaheuristic optimization to determine circumstances and applications where each are favorable. Then, a modified two-dimensional (2D) cutting stock algorithm using metaheuristics is developed for deriving optimal nest …

%B Journal of Construction Engineering and Management %V 147 %P 05021006 %G eng %N 7 %0 Journal Article %J Journal of Construction Engineering and Management %D 2020 %T Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason’s risk hump %A JuHyeong Ryu %A Abdullatif Alwasel %A Carl T Haas %A Eihab Abdel-Rahman %B Journal of Construction Engineering and Management %V 146 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0001889 %N 8 %0 Journal Article %J International Journal of Industrialized Construction %D 2020 %T Benchmarking and improving dimensional quality on modular construction projects–A case study %A Christopher Rausch %A Chloe Edwards %A Carl Haas %B International Journal of Industrialized Construction %V 1 %P 2-21 %G eng %U https://doi.org/10.29173/ijic212 %N 1 %0 Book Section %B Construction Research Congress 2020: Infrastructure Systems and Sustainability %D 2020 %T A building information modeling approach for adaptive reuse building projects %A Benjamin Sanchez %A Christoph Bindal-Gutsche %A Timo Hartmann %A Carl Haas %B Construction Research Congress 2020: Infrastructure Systems and Sustainability %I American Society of Civil Engineers %P 552-561 %G eng %U https://doi.org/10.1061/9780784482858.060 %0 Book Section %B Construction Research Congress 2020: Computer Applications %D 2020 %T Computational algorithms for digital twin support in construction %A Chris Rausch %A Benjamin Sanchez %A Mansour Esnaashary Esfahani %A Carl Haas %B Construction Research Congress 2020: Computer Applications %I American Society of Civil Engineers %P 191-200 %G eng %U https://doi.org/10.1061/9780784482865.021 %0 Journal Article %J Sustainable Cities and Society %D 2020 %T A definition framework for building adaptation projects %A Sheida Shahi %A Mansour Esnaashary Esfahani %A Chris Bachmann %A Carl Haas %B Sustainable Cities and Society %V 63 %P 102345 %G eng %U https://doi.org/10.1016/j.scs.2020.102345 %0 Book Section %B Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts %D 2020 %T Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study %A Mansour Esnaashary Esfahani %A Chris Rausch %A Carl Haas %A Bryan T Adey %B Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts %I American Society of Civil Engineers %P 330-338 %G eng %U https://doi.org/10.1061/9780784482889.035 %0 Journal Article %J Journal of Construction Engineering and Management %D 2020 %T Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory %A Mohammed SA Enshassi %A Scott Walbridge %A Jeffrey S West %A Carl T Haas %B Journal of Construction Engineering and Management %V 146 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747 %N 2 %0 Book Section %B Bridge Engineering %D 2020 %T Geometric accuracy of digital twins for structural health monitoring %A Ruodan Lu %A Chris Rausch %A Marzia Bolpagni %A Ioannis Brilakis %A Carl T Haas %B Bridge Engineering %I IntechOpen %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=8722062051834655463&btnI=1&hl=en %0 Journal Article %J Automation in Construction %D 2020 %T Health and productivity impact of semi-automated work systems in construction %A JuHyeong Ryu %A Tasha McFarland %A Bennett Banting %A Carl T Haas %A Eihab Abdel-Rahman %B Automation in Construction %V 120 %P 103396 %G eng %U https://doi.org/10.1016/j.autcon.2020.103396 %0 Journal Article %J Engineering, Construction and Architectural Management %D 2020 %T Identifying enablers for coordination across construction supply chain processes: a systematic literature review %A Qian Chen %A Daniel Mark Hall %A Bryan Tyrone Adey %A Carl Thomas Haas %B Engineering, Construction and Architectural Management %G eng %U https://doi.org/10.1108/ECAM-05-2020-0299 %0 Journal Article %J Journal of Cleaner Production %D 2020 %T Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario %A Jacky Chan %A Chris Bachmann %A Carl Haas %B Journal of Cleaner Production %V 259 %G eng %U https://doi.org/10.1016/j.jclepro.2020.120939 %0 Journal Article %J Journal of Management in Engineering %D 2020 %T Prioritizing Preproject Planning Activities Using Value of Information Analysis %A Mansour Esnaashary Esfahani %A Chris Rausch %A Carl Haas %A Bryan T Adey %B Journal of Management in Engineering %V 36 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822 %N 5 %0 Journal Article %J ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering %D 2020 %T Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives %A Mohammed SA Enshassi %A Scott Walbridge %A Jeffrey S West %A Carl T Haas %B ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering %V 6 %G eng %U https://doi.org/10.1061/AJRUA6.0001036 %N 1 %0 Journal Article %J Resources, Conservation and Recycling %D 2020 %T A selective disassembly multi-objective optimization approach for adaptive reuse of building components %A Benjamin Sanchez %A Christopher Rausch %A Carl Haas %A Rebecca Saari %B Resources, Conservation and Recycling %V 154 %G eng %U https://doi.org/10.1016/j.resconrec.2019.104605 %0 Journal Article %J Construction Innovation %D 2020 %T Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies %A Qian Chen %A Bryan T Adey %A Carl Haas %A Daniel M Hall %B Construction Innovation %V 20 %P 471-508 %G eng %U https://doi.org/10.1108/CI-11-2019-0133 %N 3 %0 Book Section %B Computing in Civil Engineering 2019: Data, Sensing, and Analytics %D 2019 %T A 3D Irregular Packing Algorithm Using Point Cloud Data %A Yinghui Zhao %A Carl T Haas %B Computing in Civil Engineering 2019: Data, Sensing, and Analytics %I American Society of Civil Engineers %P 201-208 %G eng %U https://doi.org/10.1061/9780784482438.026 %0 Conference Proceedings %B 36th International Symposium on Automation and Robotics in Construction %D 2019 %T Automated monitoring of physical fatigue using jerk %A L Zhang %A M M Diraneyya %A J Ryu %A C T Haas %A E Abdel-Rahman %B 36th International Symposium on Automation and Robotics in Construction %P 989-997 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=8104722556075343&btnI=1&hl=en %0 Journal Article %J Robotica %D 2019 %T A comparative study of in-field motion capture approaches for body kinematics measurement in construction %A JoonOh Seo %A Abdullatif Alwasel %A SangHyun Lee %A Eihab M Abdel-Rahman %A Carl Haas %B Robotica %V 37 %P 928-946 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=1810157740001472542&btnI=1&hl=en %N 5 %0 Journal Article %J Automation in Construction %D 2019 %T Deconstruction programming for adaptive reuse of buildings %A Sanchez, B. %A Rausch, C. %A Haas, C. %B Automation in Construction %V 107 %G eng %U https://doi.org/10.1016/j.autcon.2019.102921 %0 Journal Article %J Automation in Construction %D 2019 %T Impact of augmented reality and spatial cognition on assembly in construction %A C Kwiatek %A M Sharif %A S Li %A C Haas %A S Walbridge %B Automation in Construction %V 108 %G eng %U https://doi.org/10.1016/j.autcon.2019.102935 %0 Conference Proceedings %B 36th International Symposium on Automation and Robotics in Construction %D 2019 %T Improving the Quality of Event Logs in the Construction Industry for Process Mining %A L Chen %A S Kang %A S Karimidorabati %A C T Haas %B 36th International Symposium on Automation and Robotics in Construction %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=4350659542287279027&btnI=1&hl=en %0 Book %D 2019 %T Infrastructure computer vision %A Ioannis Brilakis %A Carl Thomas Michael Haas %I Butterworth-Heinemann %P 408 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=7047206967977233061&btnI=1&hl=en %0 Journal Article %J Journal of Management in Engineering %D 2019 %T Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects %A Mohammed SA Enshassi %A Scott Walbridge %A Jeffrey S West %A Carl T Haas %B Journal of Management in Engineering %V 35 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698 %N 4 %0 Journal Article %J Automation in Construction %D 2019 %T Jerk as an indicator of physical exertion and fatigue %A Zhang, L. %A Diraneyya, M.M. %A Ryu, J.H. %A Haas, C.T. %A Abdel-Rahman, E.M. %B Automation in Construction %V 104 %P 120-128 %G eng %U https://doi.org/10.1016/j.autcon.2019.04.016 %0 Thesis %B Civil Engineering %D 2019 %T Methodology for improving the net environmental impacts of new buildings through product recovery management %A Benjamin Sanchez Andrade %B Civil Engineering %G eng %U http://hdl.handle.net/10012/14537 %9 PhD thesis %0 Journal Article %J Environment Systems and Decisions %D 2019 %T A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the ݮƵ County Courthouse renovations %A Benjamin Sanchez %A Mansour Esnaashary Esfahani %A Carl Haas %B Environment Systems and Decisions %V 39 %P 419-438 %G eng %U https://doi.org/10.1007/s10669-019-09734-2 %N 4 %0 Conference Proceedings %B 7th CSCE/CRC International Construction Specialty Conference, Laval, Canada %D 2019 %T A model for measuring interface health between project stakeholders in complex construction projects %A E Eray %A C Haas %A D Rayside %B 7th CSCE/CRC International Construction Specialty Conference, Laval, Canada %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=4939819789623465796&btnI=1&hl=en %0 Journal Article %J Automation in Construction %D 2019 %T Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction %A Christopher Rausch %A Mohammad Nahangi %A Carl Haas %A Wanhua Liang %B Automation in Construction %V 103 %P 300-314 %G eng %U https://doi.org/10.1016/j.autcon.2019.03.026 %0 Conference Proceedings %B 36th International Symposium on Automation and Robotics in Construction %D 2019 %T Multi-objective Optimization Analysis for Selective Disassembly Planning of Buildings %A B Sanchez %A C Rausch %A C Haas %A R Saari %B 36th International Symposium on Automation and Robotics in Construction %P 128-135 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=7163639939980205240&btnI=1&hl=en %0 Journal Article %J Automation in construction %D 2019 %T Pipe radius estimation using Kinect range cameras %A Mohammad Nahangi %A Thomas Czerniawski %A Carl T Haas %A Scott Walbridge %B Automation in construction %V 99 %P 197-205 %G eng %U https://doi.org/10.1016/j.autcon.2018.12.015 %0 Book Section %B Computing in Civil Engineering 2019: Data, Sensing, and Analytics %D 2019 %T Selective Deconstruction Programming for Adaptive Reuse of Buildings %A Benjamin Sanchez %A Christopher Rausch %A Carl Haas %B Computing in Civil Engineering 2019: Data, Sensing, and Analytics %I American Society of Civil Engineers %P 225-232 %G eng %U https://doi.org/10.1061/9780784482438.029 %0 Conference Proceedings %B 2019 Modular and Offsite Construction (MOC) Summit %D 2019 %T Spatial parameterization of non-semantic CAD elements for supporting automated disassembly planning %A Chris Rausch %A Ben Sanchez %A Carl Haas %B 2019 Modular and Offsite Construction (MOC) Summit %P 108-115 %G eng %U https://doi.org/10.29173/mocs83 %0 Book Section %B Advances in Informatics and Computing in Civil and Construction Engineering %D 2019 %T Usage of Interface Management in Adaptive Reuse of Buildings %A Ekin Eray %A Benjamin Sanchez %A Seokyoung Kang %A Carl Haas %B Advances in Informatics and Computing in Civil and Construction Engineering %I Springer, Cham %P 725-731 %G eng %U https://doi.org/10.1007/978-3-030-00220-6_87 %0 Journal Article %J Buildings %D 2019 %T Usage of interface management system in adaptive reuse of buildings %A Ekin Eray %A Benjamin Sanchez %A Carl Haas %B Buildings %V 9 %P 105 %G eng %U https://doi.org/10.3390/buildings9050105 %N 5 %0 Conference Proceedings %B 36th International Symposium on Automation and Robotics in Construction %D 2019 %T Using Scan-to-BIM Techniques to Find Optimal Modeling Effort; A Methodology for Adaptive Reuse Projects %A M Esnaashary Esfahania %A E Eraya %A S Chuoa %A M M Sharifa %A C Haas %B 36th International Symposium on Automation and Robotics in Construction %P 772-779 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=17835127049938182788&btnI=1&hl=en %0 Journal Article %J Automation in Construction %D 2018 %T 6D DBSCAN-based segmentation of building point clouds for planar object classification %A Czerniawski, T. %A Sankaran, B. %A Nahangi, M. %A Haas, C. %A Leite, F. %B Automation in Construction %V 88 %P 44-58 %G eng %U https://doi.org/10.1016/j.autcon.2017.12.029 %0 Book Section %B Pipelines 2018: Utility Engineering, Surveying, and Multidisciplinary Topics %D 2018 %T Analyzing Conflicts over Water Extraction from Great Lakes of North America through Game Theory Approaches %A Sevda Payganeh %A Mark A Knight %A Carl T Haas %B Pipelines 2018: Utility Engineering, Surveying, and Multidisciplinary Topics %I American Society of Civil Engineers %P 195-203 %G eng %U https://doi.org/10.1061/9780784481660.022 %0 Conference Proceedings %B ASME 2018 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference %D 2018 %T Assessment of Jerk As a Method of Physical Fatigue Detection %A Lichen Zhang %A Mohsen Mutasem Diraneyya %A JuHyeong Ryu %A Carl T Haas %A Eihab Abdel-Rahman %B ASME 2018 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference %G eng %U https://doi.org/10.1115/DETC2018-86289 %0 Journal Article %J Journal of Water Resources Planning and Management %D 2018 %T Benchmark performance indicators for utility water and wastewater pipelines infrastructure %A A Ganjidoost %A MA Knight %A AJA Unger %A CT Haas %B Journal of Water Resources Planning and Management %V 144 %P 04018003 %G eng %U https://doi.org/10.1061/(ASCE)WR.1943-5452.0000890 %N 3 %0 Journal Article %J Construction Management and Economics %D 2018 %T Capital project planning for a circular economy %A Benjamin Sanchez %A Carl Haas %B Construction Management and Economics %V 36 %P 303-312 %G eng %U https://doi.org/10.1080/01446193.2018.1435895 %N 6 %0 Conference Proceedings %B International Symposium on Automation and Robotics in Construction %D 2018 %T A conceptual framework for tracking design completeness of Track Line discipline in MRT projects %A E Eray %A CT Haas %A D Rayside %A M Golparvar-Fard %B International Symposium on Automation and Robotics in Construction %V 35 %P 1-7 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=15401547300572318404&btnI=1&hl=en %0 Journal Article %J International Journal of Construction Management %D 2018 %T A decision-making method for choosing concrete forming systems %A Mahdi Safa %A Sean Reinsma %A Carl T Haas %A Paul M Goodrum %A Carlos H Caldas %B International Journal of Construction Management %V 18 %P 53-64 %G eng %U https://doi.org/10.1080/15623599.2016.1253243 %N 1 %0 Conference Paper %B Workshop of the European Group for Intelligent Computing in Engineering %D 2018 %T Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control %A Nicolas Jeanclos %A Mohammad-Mahdi Sharif %A Shang Kun Li %A Caroline Kwiatek %A Carl Haas %B Workshop of the European Group for Intelligent Computing in Engineering %I Springer, Cham %V 10863 %P 336-358 %G eng %U https://doi.org/10.1007/978-3-319-91635-4_18 %0 Conference Proceedings %B International Symposium on Automation and Robotics in Construction %D 2018 %T Evaluating artificial intelligence tools for automated practice conformance checking %A S Kang %A CT Haas %B International Symposium on Automation and Robotics in Construction %V 35 %G eng %U https://doi.org/10.22260/isarc2018%2F0015 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2018 %T Facilitating the Communication of Rework Information to Craft Workers Using an Augmented Reality Process %A C Kwiatek %A SK Li %A MM Sharif %A N Jeanclos %A CT Haas %A S Walbridge %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 35 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=15915907439949132890&btnI=1&hl=en %0 Journal Article %J Journal of Management in Engineering %D 2018 %T How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms %A Wenxin Shen %A Byungjoo Choi %A SangHyun Lee %A Wenzhe Tang %A Carl T Haas %B Journal of Management in Engineering %V 34 %P 04018032 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639 %N 6 %0 Journal Article %J Advanced Engineering Informatics %D 2018 %T Improving construction industry process interoperability with Industry Foundation Processes (IFP) %A Behrooz Golzarpoor %A Carl T Haas %A Derek Rayside %A Seokyoung Kang %A Matthew Weston %B Advanced Engineering Informatics %V 38 %P 555-568 %G eng %U https://doi.org/10.1016/j.aei.2018.09.001 %0 Conference Proceedings %B International Symposium on Automation and Robotics in Construction %D 2018 %T Motion data based construction worker training support tool: Case study of masonry work %A JuHyeong Ryu %A Lichen Zhang %A Carl T Haas %A Eihab Abdel-Rahman %B International Symposium on Automation and Robotics in Construction %V 35 %G eng %U https://doi.org/10.22260/isarc2018%2F0150 %0 Journal Article %J Journal of Cleaner Production %D 2018 %T A novel selective disassembly sequence planning method for adaptive reuse of buildings %A Sanchez, B. %A Haas, C. %B Journal of Cleaner Production %V 183 %P 998-1010 %G eng %U https://doi.org/10.1016/j.jclepro.2018.02.201 %0 Conference Proceedings %B International Symposium on Automation and Robotics in Construction %D 2018 %T PIECE 3D: Portable Interactive Education for Construction Engineering in 3D %A S Kang %A H Cho %A K Kang %A M Kang %A CT Haas %B International Symposium on Automation and Robotics in Construction %V 35 %P 1-7 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=12043666691639473230&btnI=1&hl=en %0 Conference Proceedings %B EG-ICE %D 2018 %T A Quantitative Comparison of Adaptive Reuse Strategies of Residential Towers in Northern Climates %A Sheida Shahi %A Carl Haas %A Philip Beesley %B EG-ICE %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=12295065544968536416&btnI=1&hl=en %0 Journal Article %J Journal of Management in Engineering %D 2017 %T Applying very large scale integration reliability theory for understanding the impacts of type II risks on megaprojects %A Maryam Shahtaheri %A Carl T Haas %A Roozbeh Rashedi %B Journal of Management in Engineering %V 33 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000504 %N 4 %0 Journal Article %J Computer‐Aided Civil and Infrastructure Engineering %D 2017 %T Automated model‐based finding of 3D objects in cluttered construction point cloud models %A Mohammad‐Mahdi Sharif %A Mohammad Nahangi %A Carl Haas %A Jeffrey West %B Computer‐Aided Civil and Infrastructure Engineering %V 32 %P 893-908 %G eng %U https://doi.org/10.1111/mice.12306 %N 11 %0 Journal Article %J International Journal of Construction Management %D 2017 %T Construction contract management using value packaging systems %A Mahdi Safa %A Arash Shahi %A Carl T Haas %A Keith W Hipel %B International Journal of Construction Management %V 17 %P 50-64 %G eng %U https://doi.org/10.1080/15623599.2016.1167369 %N 1 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2017 %T Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement %A Di Zhang %A Hassan Nasir %A Carl T Haas %B Canadian Journal of Civil Engineering %V 44 %P 518-529 %G eng %U https://scholar.google.ca/citations?hl=en&user=lmA9rO4AAAAJ&view_op=list_works&sortby=pubdate#d=gs_md_cita-d&u=%2Fcitations%3Fview_op%3Dview_citation%26hl%3Den%26user%3DlmA9rO4AAAAJ%26cstart%3D20%26pagesize%3D80%26sortby%3Dpubdate%26citation_for_view%3Dlm %N 7 %0 Journal Article %D 2017 %T Dimensional variability analysis of construction assemblies using kinematics chains and building information model %A M Nahangi %A C Rausch %A CT Haas %A Jeffrey West %V 34 %G eng %U https://www.semanticscholar.org/paper/Dimensional-Variability-Analysis-of-Construction-Nahangi-Haas/a67265a486d24be97b4980f5f0d37fb8ad4a4d45?p2df %0 Thesis %B Journal of Construction Engineering and Management, Volume 143, issue 6 %D 2017 %T Experience, Productivity, and Musculoskeletal Injury among Masonry Workers %A Alwasel, A. %A Abdel-Rahman, E.M. %A Haas, C.T. %A Lee, S.H. %B Journal of Construction Engineering and Management, Volume 143, issue 6 %G eng %U https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001308 %0 Journal Article %J Journal of Management in Engineering %D 2017 %T Exploratory study on the effectiveness of interface-management practices in dealing with project complexity in large-scale engineering and construction projects %A Seungjun Ahn %A Samin Shokri %A SangHyun Lee %A Carl T Haas %A Ralph CG Haas %B Journal of Management in Engineering %V 33 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000488 %N 2 %0 Journal Article %J Journal of Biomechanical Engineering %D 2017 %T Fatigue detection using phase-space warping %A A Alwasel %A M Yung %A E Abel-Rahman %A R Wells %A C Haas %B Journal of Biomechanical Engineering %V 139 %G eng %U https://doi.org/10.1115/1.4035367 %N 3 %0 Thesis %B Automation in Construction %D 2017 %T Identifying poses of safe and productive masons using machine learning %A Haas, C. %B Automation in Construction %G eng %0 Journal Article %J Sustainable Cities and Society %D 2017 %T Improving sustainable office building operation by using historical data and linear models to predict energy usage %A Majeed Safa %A Mahdi Safa %A Jeremy Allen %A Arash Shahi %A Carl T Haas %B Sustainable Cities and Society %V 29 %P 107-117 %G eng %U https://doi.org/10.1016/j.scs.2016.12.001 %0 Journal Article %J Automation in Construction %D 2017 %T Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds %A Christopher Rausch %A Mohammad Nahangi %A Carl Haas %A Jeffrey West %B Automation in Construction %V 75 %G eng %U https://doi.org/10.1016/j.autcon.2016.12.001 %N 33-44 %0 Book Section %B Computing in Civil Engineering %D 2017 %T Level-of-Expertise Classification for Identifying Safe and Productive Masons %A Abdullatif Alwasel %A Mohammad Nahangi %A Carl Haas %A Eihab Abdel-Rahman %B Computing in Civil Engineering %P 359-368 %G eng %U https://doi.org/10.1061/9780784480823.043 %0 Thesis %B Automation in Construction, volume 83, p: 303-305 %D 2017 %T Managing risk in modular construction using dimensional and geometric tolerance strategies %A Shahtaheri, Y. %A Rausch, C. %A West, J. %A Haas, C. %A Nahangi, M. %B Automation in Construction, volume 83, p: 303-305 %G eng %U http://www.sciencedirect.com/science/article/pii/S0926580517302340 %0 Journal Article %J Engineering, Construction and Architectural Management %D 2017 %T A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects %A Maryam Shahtaheri %A Carl Thomas Haas %A Tabassom Salimi %B Engineering, Construction and Architectural Management %G eng %U https://scholar.google.ca/citations?hl=en&user=lmA9rO4AAAAJ&view_op=list_works&sortby=pubdate#d=gs_md_cita-d&u=%2Fcitations%3Fview_op%3Dview_citation%26hl%3Den%26user%3DlmA9rO4AAAAJ%26cstart%3D20%26pagesize%3D80%26sortby%3Dpubdate%26citation_for_view%3Dlm %0 Journal Article %J Journal of computing in civil engineering %D 2017 %T Optimum assembly planning for modular construction components %A Christopher Rausch %A Mohammad Nahangi %A Melanie Perreault %A Carl T Haas %A Jeffrey West %B Journal of computing in civil engineering %V 31 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000605 %N 1 %0 Conference Paper %B 6th CSCE-CRC International Construction Specialty Conference 2017 %D 2017 %T An overview on integrating interface management and building information management systems %A Ekin Eray %A B Golzarpoo %A Derek Rayside %A Carl Haas %B 6th CSCE-CRC International Construction Specialty Conference 2017 %P 196-205 %G eng %U https://www.researchgate.net/profile/Ekin-Eray/publication/320934456_An_overview_on_integrating_Interface_Management_and_Building_Information_Management_Systems/links/5a034e55a6fdcc8f6c5f776c/An-overview-on-integrating-Interface-Management-and-Building-In %0 Journal Article %J Environment Systems and Decisions %D 2017 %T Understanding the total life cycle cost implications of reusing structural steel %A J Yeung %A S Walbridge %A C Haas %A R Saari %B Environment Systems and Decisions %V 37 %P 101-120 %G eng %U https://link.springer.com/article/10.1007%2Fs10669-016-9621-6 %N 1 %0 Book Section %B Construction Research Congress 2016 %D 2016 %T Action recognition using a wristband-type activity tracker: Case study of masonry work %A JuHyeong Ryu %A JoonOh Seo %A Meiyin Liu %A SangHyun Lee %A Carl T Haas %B Construction Research Congress 2016 %P 790-799 %G eng %U https://doi.org/10.1061/9780784479827.080 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2016 %T Algorithm for Determining the Criticality of Documents within a Construction Information System %A AJ Chettupuzha %A CT Haas %B Journal of Computing in Civil Engineering %V 30 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=14284179971133488629 %N 3 %0 Journal Article %J Modular and Offsite Construction (MOC) Summit Proceedings %D 2016 %T Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project %A Christopher Rausch %A Lichen Zhang %A Jeffrey West %A Carl Haas %B Modular and Offsite Construction (MOC) Summit Proceedings %G eng %U https://doi.org/10.29173/mocs32 %0 Journal Article %J Modular and Offsite Construction (MOC) Summit Proceedings %D 2016 %T Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project %A Christopher Rausch %A Lichen Zhang %A Jeffrey West %A Carl Haas %B Modular and Offsite Construction (MOC) Summit Proceedings %G eng %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2016 %T Applying the Concept of Selective Assembly to Modular Construction to Mitigate Impacts of Component Variability %A Christopher Rausch %A Mohammad Nahangi %A Melanie Perreault %A Carl Haas %A Jeffrey West %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 33 %G eng %U https://www.semanticscholar.org/paper/Applying-the-Concept-of-Selective-Assembly-to-to-of-Rausch-Nahangi/22354b961f3f7360681b46aaa2bcb809100266f8?p2df %N 1 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2016 %T Arbitrary 3D object extraction from cluttered laser scans using local features %A M Nahangi %A T Czerniawski %A C Rausch %A CT Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 33 %P 1 %G eng %U https://www.semanticscholar.org/paper/Arbitrary-3D-Object-Extraction-from-Cluttered-Laser-Nahangi-Czerniawski/e4c7b6be2d9ff94bfc87cd7f7733e2a56181bdf9?p2df %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2016 %T Automated removal of planar clutter from 3D point clouds for improving industrial object recognition %A T Czerniawski %A M Nahangi %A S Walbridge %A C Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 33 %P 1 %G eng %U https://www.semanticscholar.org/paper/Automated-Removal-of-Planar-Clutter-from-3D-Point-Czerniawski-Nahangi/48dace3eaf75d2030ebf7070bebeb899b78b16b1?p2df %0 Journal Article %J Journal of Computing in Civil Engineering %D 2016 %T Automatic realignment of defective assemblies using an inverse kinematics analogy %A Mohammad Nahangi %A Carl T Haas %A Jeffrey West %A Scott Walbridge %B Journal of Computing in Civil Engineering %V 30 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000477 %N 2 %0 Journal Article %J Journal of Construction Engineering and Management %D 2016 %T Current status of interface management in construction: Drivers and effects of systematic interface management %A Samin Shokri %A Seungjun Ahn %A S Lee %A Carl T Haas %A RCG Haas %B Journal of Construction Engineering and Management %V 142 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0001035 %N 2 %0 Journal Article %J Engineering, construction and architectural management %D 2016 %T Evaluation of automation levels for construction change management %A Shahin Karimidorabati %A Carl T Haas %A Joel Gray %B Engineering, construction and architectural management %G eng %U https://doi.org/10.1108/ECAM-01-2015-0013 %0 Journal Article %J Advanced Engineering Informatics %D 2016 %T Improving process conformance with industry foundation processes (IFP) %A Behrooz Golzarpoor %A Carl T Haas %A Derek Rayside %B Advanced Engineering Informatics %V 30 %P 143-156 %G eng %U https://doi.org/10.1016/j.aei.2016.02.005 %N 2 %0 Journal Article %D 2016 %T Innovation in Construction Health, Safety and Environmental Research %A Carl Haas %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=16073874340119273326 %0 Journal Article %J Journal of Infrastructure Systems %D 2016 %T An integrated productivity-practices implementation index for planning the execution of infrastructure projects %A Hassan Nasir %A Carl T Haas %A Carlos H Caldas %A Paul M Goodrum %B Journal of Infrastructure Systems %V 22 %G eng %U https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275 %N 2 %0 Thesis %B Journal of Construction Engineering and Management, 142 (2) %D 2016 %T Interface-management process for managing risks in complex capital projects %A Shokri, S. %A Haas, C.T. %A Lee, R.C.G. %A S.H. %B Journal of Construction Engineering and Management, 142 (2) %G eng %U https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000990 %0 Journal Article %J Journal of Construction Engineering and Management %D 2016 %T Interface-management process for managing risks in complex capital projects %A Samin Shokri %A Carl T Haas %A Ralph C G. Haas %A Sang Hyun Lee %B Journal of Construction Engineering and Management %V 142 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000990 %N 2 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2016 %T Optimizing contractor selection for construction packages in capital projects %A Mahdi Safa %A Ming-Ho Yee %A Derek Rayside %A Carl T Haas %B Journal of Computing in Civil Engineering %V 30 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000555 %N 5 %0 Journal Article %J Modular and Offsite Construction (MOC) Summit Proceedings %D 2016 %T Optimum assembly planning for modular construction using BIM and 3D point clouds %A Mohammad Nahangi %A Christopher Rausch %A Carl Haas %B Modular and Offsite Construction (MOC) Summit Proceedings %G eng %U https://doi.org/10.29173/mocs7 %0 Journal Article %J Modular and Offsite Construction (MOC) Summit Proceedings %D 2016 %T Optimum assembly planning for modular construction using BIM and 3D point clouds %A Mohammad Nahangi %A Christopher Rausch %A Carl Haas %B Modular and Offsite Construction (MOC) Summit Proceedings %G eng %U https://doi.org/10.29173/mocs7 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2016 %T Parallel systems and structural frames realignment planning and actuation strategy %A Mohammad Nahangi %A Thomas Czerniawski %A Carl T Haas %A Scott Walbridge %A Jeffrey West %B Journal of Computing in Civil Engineering %V 30 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000545 %N 4 %0 Thesis %B Automation in Construction, volume: 71, p: 346-358 %D 2016 %T Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor, Automation in Construction %A Czerniawski, T. %A Nahangi, M. %A Haas, C. %A Walbridge, S. %B Automation in Construction, volume: 71, p: 346-358 %G eng %U http://www.sciencedirect.com/science/article/pii/S0926580516301650 %0 Journal Article %D 2016 %T RESILIENT INFRASTRUCTURE %A Mohamad-Mahdi Sharif %A Mohammad Nahangi %A Carl Haas %A Jeffrey West %A Magdy Ibrahim %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=12188874308135879944 %0 Journal Article %D 2016 %T RESILIENT INFRASTRUCTURE %A Christopher T Rausch %A Mohammad Nahangi %A Carl Haas %A Jeffrey West %A Melanie Perreault %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=13538945475943283888&btnI=1&hl=en %0 Journal Article %J Construction Management and Economics %D 2016 %T Risk-chasing behaviour in on-site construction decisions %A Jean-Charles Fiolet %A Carl Haas %A Keith Hipel %B Construction Management and Economics %V 34 %P 845-858 %G eng %U https://doi.org/10.1080/01446193.2016.1207790 %N 12 %0 Journal Article %J Construction Management and Economics %D 2016 %T Risk-chasing behaviour in on-site construction decisions %A Jean-Charles Fiolet %A Carl Haas %A Keith Hipel %B Construction Management and Economics %V 34 %P 845-858 %G eng %U https://doi.org/10.1080/01446193.2016.1207790 %N 12 %0 Thesis %B Automation in Construction, volume: 61, p: 147-161 %D 2016 %T Skeleton-based discrepancy feedback for automated realignment of industrial assemblies %A Nahangi, M. %A Haas, C.T. %B Automation in Construction, volume: 61, p: 147-161 %G eng %U http://www.sciencedirect.com/science/article/pii/S0926580515002198 %0 Journal Article %J Automation in construction %D 2016 %T Skeleton-based discrepancy feedback for automated realignment of industrial assemblies %A Mohammad Nahangi %A Carl T Haas %B Automation in construction %V 61 %P 147-161 %G eng %U https://doi.org/10.1016/j.autcon.2015.10.014 %0 Journal Article %J Journal of Management in Engineering %D 2016 %T Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects %A Yongwei Shan %A Dong Zhai %A Paul M Goodrum %A Carl T Haas %A Carlos H Caldas %B Journal of Management in Engineering %V 32 %G eng %U https://doi.org/10.1061/(ASCE)ME.1943-5479.0000375 %N 1 %0 Book Section %B Construction Research Congress 2016 %D 2016 %T A stochastic simulation approach for the integration of risk and uncertainty into megaproject cost and schedule estimates %A Maryam Shahtaheri %A Carl T Haas %A Tabassom Salimi %B Construction Research Congress 2016 %P 607-615 %G eng %U https://doi.org/10.1061/9780784479827.062 %0 Journal Article %D 2015 %T Application of prospect theory to management decisions under risk on construction projects %A Jean-Charles Fiolet %A Carl T Haas %G eng %U https://pdfs.semanticscholar.org/c7ab/76f6cf33de0a525cd76601c4cea07a41a386.pdf %0 Journal Article %D 2015 %T Assessing the management practices for small to medium sized Canadian general contractor organizations %A Jeff Rankin %A Thomas M Froese %A Mohamed Issa %A Rhoda Quaigrain %A Carl T Haas %A Hassan Nasir %G eng %U https://doi.org/10.14288/1.0076493 %0 Journal Article %D 2015 %T Automated 3D Shape Detection and Outlier Removal in Cluttered Laser Scans of Industrial Assemblies %A Mohammad Nahangi %A Thomas Czerniawski %A Carl T Haas %P 24-26 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=9614116116457053865 %0 Thesis %B Automation in Construction, 56, pp. 36-46 %D 2015 %T Automated assembly discrepancy feedback using 3D imaging and forward kinematics %A Nahangi, M. %A Yeung, J. %A Haas, C.T. %A Walbridge, S. %A West, J. %B Automation in Construction, 56, pp. 36-46 %G eng %0 Journal Article %J Automation in Construction %D 2015 %T Automated assembly discrepancy feedback using 3D imaging and forward kinematics %A Mohammad Nahangi %A Jamie Yeung %A Carl T Haas %A Scott Walbridge %A Jeffrey West %B Automation in Construction %V 56 %P 36-46 %G eng %U https://doi.org/10.1016/j.autcon.2015.04.005 %0 Journal Article %J Structures %D 2015 %T Automating measurement process to improve quality management for piping fabrication %A Mahdi Safa %A Arash Shahi %A Mohammad Nahangi %A Carl Haas %A Hamid Noori %B Structures %V 3 %P 71-80 %G eng %U https://doi.org/10.1016/j.istruc.2015.03.003 %0 Journal Article %D 2015 %T Classification of construction projects %A M Safa %A A Sabet %A S MacGillivray %A M Davidson %A K Kaczmarczyk %A GE Gibson %A D Rayside %A C Haas %G eng %U https://uwspace.uwaterloo.ca/handle/10012/11560 %0 Journal Article %J Automation in Construction %D 2015 %T Competitive intelligence (CI) for evaluation of construction contractors %A Mahdi Safa %A Arash Shahi %A Carl T Haas %A Dawn Fiander-McCann %A Majeed Safa %A Keith Hipel %A Sandra MacGillivray %B Automation in Construction %V 59 %P 149-157 %G eng %U https://doi.org/10.1016/j.autcon.2015.02.009 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2015 %T Data fusion process management for automated construction progress estimation %A Arash Shahi %A Mahdi Safa %A Carl T Haas %A Jeffrey S West %B Journal of Computing in Civil Engineering %V 29 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000436 %N 6 %0 Journal Article %J Canadian Society for Civil Engineering Construction Specialty Conference %D 2015 %T Identifying influential factors for capital construction project planning strategies %A Mahdi Safa %A Sandra MacGillivray %A Mike Davidson %A K Kaczmarczy %A C Haas %A E Gibson %B Canadian Society for Civil Engineering Construction Specialty Conference %G eng %U https://www.semanticscholar.org/paper/Identifying-influential-factors-for-capital-project-Safa-MacGillivray/33bc912b3f1105dde86612480ed48e79624c0728?p2df %0 Conference Paper %B 5th Int. Construction Specialty Confence %D 2015 %T An image-based frameworks for automated discrepancy quantification and realignment of industrial assemblies %A Mohammad Nahangi %A Thomas Czerniawski %A Jamie Yeung %A Carl T Haas %A Scott Walbridge %A JS West %B 5th Int. Construction Specialty Confence %P 0471-0479 %G eng %U https://pdfs.semanticscholar.org/d9ed/4494715eeecc79dcd512acf17cfe15d80853.pdf %0 Journal Article %D 2015 %T Implementation of Construction Industry Best Practices into Workflow Management Systems %A Behrooz Golzarpoor %A Carl Haas %G eng %U https://www.semanticscholar.org/paper/Implementation-of-construction-industry-best-into-Golzarpoor-Haas/c3cd6df679dea9bb5cc5847b4f1884f9b9da10dd?p2df %0 Journal Article %J Advanced Engineering Informatics %D 2015 %T Infrastructure computer vision %A Ioannis Brilakis %A Carl Haas %B Advanced Engineering Informatics %V 2 %P 147-148 %G eng %U https://www.infona.pl/resource/bwmeta1.element.elsevier-103f8c69-a679-3482-9824-180c83b55b8c %N 29 %0 Journal Article %J International Construction Specialty Conference of the Canadian Society for Civil Engineering %D 2015 %T INTEGRATED ASSET MANAGEMENT OF WATER AND WASTEWATER INFRASTRUCTURE SYSTEMS—BORROWING FROM INDUSTRY FOUNDATION CLASSES %A Amin Ganjidoost %A Carl T Haas %A Mark A Knight %A Andre JA Unger %B International Construction Specialty Conference of the Canadian Society for Civil Engineering %G eng %U https://www.researchgate.net/profile/Amin-Ganjidoost/publication/319490999_INTEGRATED_ASSET_MANAGEMENT_OF_WATER_AND_WASTEWATER_INFRASTRUCTURE_SYSTEMS-BORROWING_FROM_INDUSTRY_FOUNDATION_CLASSES/links/59aed670458515150e4738bc/INTEGRATED-ASSET-MANAGEMENT-OF- %0 Book Section %B Automation in Construction %D 2015 %T ISARC 2013 %A Carl Haas %A Frederic Bosche %A Changwan Kim %B Automation in Construction %V 49 %P 175-175 %G eng %U https://doi.org/10.1016/j.autcon.2014.11.002 %0 Journal Article %D 2015 %T Method to assess the level of implementation of productivity practices on industrial projects %A Carlos H Caldas %A Jung-Yeol Kim %A Carl T Haas %A Paul M Goodrum %A Di Zhang %V 141 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919 %N 1 %0 Journal Article %J 5th International/11th Construction Specialty Conference %D 2015 %T Motivation For Interface Management In Construction: A Project Complexity Perspective %A Seungjun Ahn %A Samin Shokri %A S Lee %A C Haas %A R Haas %B 5th International/11th Construction Specialty Conference %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=15930760848633137999 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2015 %T Numerical DAE approach for solving a system dynamics problem %A Atefeh Shadpour %A Andre JA Unger %A Mark A Knight %A Carl T Haas %B Journal of Computing in Civil Engineering %V 29 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000349 %N 3 %0 Journal Article %J Welding in the World %D 2015 %T Quality assurance for high-frequency mechanical impact (HFMI) treatment of welds using handheld 3D laser scanning technology %A Kasra Ghahremani %A Mahdi Safa %A Jamie Yeung %A Scott Walbridge %A Carl Haas %A Sebastien Dubois %B Welding in the World %V 59 %P 391-400 %G eng %U https://link.springer.com/article/10.1007/s40194-014-0210-3 %N 3 %0 Journal Article %J International Journal of Rail Transportation %D 2015 %T Rail corrosion forensics using 3D imaging and finite element analysis %A Mahdi Safa %A Ali Sabet %A Kasra Ghahremani %A Carl Haas %A Scott Walbridge %B International Journal of Rail Transportation %V 3 %P 164-178 %G eng %U https://doi.org/10.1080/23248378.2015.1054622 %N 3 %0 Journal Article %J Modular and Offsite Construction (MOC) Summit Proceedings %D 2015 %T Risk Mitigation through Tolerance Strategies for Design in Modularization %A Yasaman Shahtaheri %A Christopher Rausch %A Jeffrey West %A Carl Haas %A Mohammad Nahangi %B Modular and Offsite Construction (MOC) Summit Proceedings %G eng %U https://journalofindustrializedconstruction.com/index.php/mocs/article/view/166 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2015 %T Robotic Kinematics Analogy for Realignment of Defective Construction Assemblies %A M Nahangi %A J Yeung %A C Haas %A S Walbridge %A J West %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 32 %G eng %U https://www.semanticscholar.org/paper/Robotic-Kinematics-Analogy-for-Realignment-of-Nahangi-Yeung/3ae1231f4599e2465e6646b28ef6d9594fdcfee6?p2df %N 1 %0 Journal Article %J Resources, conservation and recycling %D 2015 %T The role of geometric characterization in supporting structural steel reuse decisions %A Jamie Yeung %A Scott Walbridge %A Carl Haas %B Resources, conservation and recycling %V 104 %P 120-130 %G eng %U https://doi.org/10.1016/j.resconrec.2015.08.017 %0 Journal Article %J Journal of Construction Engineering and Management %D 2015 %T Setting baseline rates for on-site work categories in the construction industry %A Maryam Shahtaheri %A Hassan Nasir %A Carl T Haas %B Journal of Construction Engineering and Management %V 141 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000959 %N 5 %0 Book Section %B Computing in Civil Engineering %D 2015 %T Skeleton-based registration of 3D laser scans for automated quality assurance of industrial facilities %A M Nahangi %A L Chaudhary %A J Yeung %A CT Haas %A S Walbridge %B Computing in Civil Engineering %P 33-40 %G eng %U https://doi.org/10.1061/9780784479247.005 %0 Journal Article %J Advanced Engineering Informatics %D 2015 %T State of research in automatic as-built modelling %A Viorica Pătrăucean %A Iro Armeni %A Mohammad Nahangi %A Jamie Yeung %A Ioannis Brilakis %A Carl Haas %B Advanced Engineering Informatics %V 29 %P 162-171 %G eng %U https://doi.org/10.1016/j.aei.2015.01.001 %N 2 %0 Thesis %B Advanced Engineering Informatics, 29 (2), pp. 162-171 %D 2015 %T State of research in automatic as-built modelling %A Petreucean, V. %A Armeni, I. %A Nahangi, M. %A Yeung, J. %A Brilakis, I. %A Haas, C. %B Advanced Engineering Informatics, 29 (2), pp. 162-171 %G eng %U https://www.sciencedirect.com/science/article/pii/S1474034615000026 %0 Journal Article %J Journal‐American Water Works Association %D 2015 %T Strategic water utility management and financial planning using a new system dynamics tool %A Rashid Rehan %A Andre Unger %A Mark A Knight %A Carl Haas %B Journal‐American Water Works Association %V 107 %P E22-E36 %G eng %U https://doi.org/10.5942/jawwa.2015.107.0006 %N 1 %0 Thesis %B Automation in Construction, 49, pp. 201-213 %D 2015 %T The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components %A Bosche, F. %A Ahmed, M. %A Turkan, Y. %A Haas, C.T. %A Haas, R. %B Automation in Construction, 49, pp. 201-213 %G eng %U https://www.sciencedirect.com/science/article/pii/S0926580514001319 %0 Journal Article %J Automation in Construction %D 2015 %T The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components %A Frederic Bosche %A Mahmoud Ahmed %A Yelda Turkan %A Carl T Haas %A Ralph Haas %B Automation in Construction %V 49 %P 201-213 %G eng %U https://doi.org/10.1016/j.autcon.2014.05.014 %0 Journal Article %J Construction Management and Economics %D 2014 %T An analysis of construction productivity differences between Canada and the United States %A Hassan Nasir %A Hani Ahmed %A Carl Haas %A Paul M Goodrum %B Construction Management and Economics %V 32 %P 595-607 %G eng %U https://doi.org/10.1080/01446193.2013.848995 %N 6 %0 Journal Article %J Advanced Engineering Informatics %D 2014 %T Automated 3D compliance checking in pipe spool fabrication %A Mohammad Nahangi %A Carl T Haas %B Advanced Engineering Informatics %V 28 %P 360-369 %G eng %U https://doi.org/10.1016/j.aei.2014.04.001 %N 4 %0 Book Section %B Computing in Civil and Building Engineering %D 2014 %T Automated Deviation Analysis for As-Built Status Assessment of Steel Assemblies and Pipe Spools %A M Nahangi %A J Yeung %A J Amaral %A FN Freitas %A S Walbridge %A CT Haas %B Computing in Civil and Building Engineering %P 2063-2070 %G eng %U https://doi.org/10.1061/9780784413616.256 %0 Thesis %B Advanced Engineering Informatics, in press %D 2014 %T Automated Form Checking for Pipe Spool Fabrication %A Nahangi, M. %A Haas, C. %B Advanced Engineering Informatics, in press %G eng %0 Book Section %B Construction Research Congress 2014: Construction in a Global Network %D 2014 %T Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication %A Mohammad Nahangi %A Mahdi Safa %A Arash Shahi %A Carl T Haas %B Construction Research Congress 2014: Construction in a Global Network %P 1004-1013 %G eng %U https://doi.org/10.1061/9780784413517.103 %0 Journal Article %J Journal of computing in Civil Engineering %D 2014 %T Automatic detection of cylindrical objects in built facilities %A Mahmoud Fouad Ahmed %A Carl T Haas %A Ralph Haas %B Journal of computing in Civil Engineering %V 28 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000329 %N 3 %0 Journal Article %J Construction Research Congress 2014: Construction in a Global Network %D 2014 %T Comparison of methods used for detecting unknown structural elements in three-dimensional point clouds %A Jamie Yeung %A Mohammad Nahangi %A Yasaman Shahtaheri %A Carl Haas %A Scott Walbridge %A Jeffrey West %B Construction Research Congress 2014: Construction in a Global Network %G eng %U https://doi.org/10.1061/9780784413517.097 %0 Book Section %B Construction Research Congress 2014: Construction in a Global Network %D 2014 %T Current state of interface management in mega-construction projects %A Samin Shokr %A Seungjun Ahn %A Thomas Czerniawski %A Carl T Haas %A Sang Hyun Lee %B Construction Research Congress 2014: Construction in a Global Network %G eng %U https://doi.org/10.1061/9780784413517.230 %0 Journal Article %J Tunnelling and Underground Space Technology %D 2014 %T Financially sustainable management strategies for urban wastewater collection infrastructure–Implementation of a system dynamics model %A Rashid Rehan %A Andre JA Unger %A Mark A Knight %A Carl T Haas %B Tunnelling and Underground Space Technology %V 39 %P 102-115 %G eng %U https://doi.org/10.1016/j.tust.2012.12.004 %0 Journal Article %J Tunnelling and Underground Space Technology %D 2014 %T Financially sustainable management strategies for urban wastewater collection infrastructure–development of a system dynamics model %A Rashid Rehan %A Mark A Knight %A Andreh JA Unger %A Carl T Haas %B Tunnelling and Underground Space Technology %V 39 %P 116-129 %G eng %U https://doi.org/10.1016/j.tust.2012.12.003 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2014 %T Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses %A Yongwei Shan %A Jung Yeol Kim %A Paul M Goodrum %A Carlos H Caldas %A Carl Haas %B Canadian Journal of Civil Engineering %V 41 %G eng %U https://doi.org/10.1139/cjce-2014-0079 %N 12 %0 Patent %D 2014 %T Method for applying powder to a printed sheet and printing press for carrying out the method %A Reiner Goetz %A Claudius Haas %A Reiner Haas %A Marius Stelter %7 United States of America %V 8757061 %G eng %U https://patents.google.com/patent/US8757061B2/en %& US %0 Journal Article %D 2014 %T A model of construction contractor selection using competitive intelligence (CI) %A Mahdi Safa %A Arash Shahi %A Carl T Haas %A Majeed Safa %A Keith Hipel %A Sandra MacGillivray %A Dawn Fiander-McCann %G eng %U http://dspace.lincoln.ac.nz/handle/10182/6304 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2014 %T A preliminary investigation into automated identification of structural steel without a priori knowledge %A J Yeung %A M Nahangi %A S Walbridge %A CT Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 31 %G eng %U https://d1wqtxts1xzle7.cloudfront.net/48932510/A_Preliminary_Investigation_into_Automat20160918-30849-8g2oiy.pdf?1474207998=&response-content-disposition=inline%3B+filename%3DA_Preliminary_Investigation_into_Automat.pdf&Expires=1618411969&Signature=XVEfnY %N 1 %0 Journal Article %J Automation in Construction %D 2014 %T Supplier selection process in an integrated construction materials management model %A Mahdi Safa %A Arash Shahi %A Carl T Haas %A Keith W Hipel %B Automation in Construction %V 48 %P 64-73 %G eng %U https://doi.org/10.1016/j.autcon.2014.08.008 %0 Conference Paper %B International Design Engineering Technical Conferences and Computers and Information in Engineering Conference %D 2014 %T A Technique to Detect Fatigue in the Lower Limbs %A Abdullatif A Alwasel %A Eihab M Abdel-Rahman %A Carl T Haas %B International Design Engineering Technical Conferences and Computers and Information in Engineering Conference %G eng %U https://doi.org/10.1115/DETC2014-35484 %0 Journal Article %J Construction Innovation %D 2014 %T Tracking of secondary and temporary objects in structural concrete work %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Construction Innovation %G eng %U https://doi.org/10.1108/CI-12-2012-0063 %0 Thesis %B Journal of Computing in Civil Engineering, 28 (4) %D 2014 %T Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system %A Bosche, F. %A Guillemet, A. %A Turkan, Y. %A Haas, C.T. %A Haas, R. %B Journal of Computing in Civil Engineering, 28 (4) %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CP.1943-5487.0000343 %0 Journal Article %J Journal of computing in civil engineering %D 2014 %T Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system %A Frederic Bosche %A Adrien Guillemet %A Yelda Turkan %A Carl T Haas %A Ralph Haas %B Journal of computing in civil engineering %V 28 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000343 %N 4 %0 Journal Article %J Journal of Construction Engineering and Management %D 2014 %T Validation methodologies and their impact in construction productivity research %A Jiali Liu %A Arash Shahi %A Carl T Haas %A Paul Goodrum %A Carlos H Caldas %B Journal of Construction Engineering and Management %V 140 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000882 %N 10 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2014 %T Workflow-based construction research data management and dissemination %A Arash Shahi %A Carl T Haas %A Jeffrey S West %A Burcu Akinci %B Journal of Computing in Civil Engineering %V 28 %P 244-252 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000251 %N 2 %0 Thesis %B J. Comput. Civ. Eng., 28(2), 244–252 %D 2014 %T Workflow-Based Construction Research Data Management and Dissemination %A Shahi, A. %A Haas, C. %A West, J. %A Akinci, B. %B J. Comput. Civ. Eng., 28(2), 244–252 %G eng %0 Thesis %B Computing in Civil Engineering, 28 (3), 04014009 %D 2013 %T Automatic Detection of Cylindrical Objects in Built Facilities %A Ahmed, M. %A Haas, R. %A Haas, C. %B Computing in Civil Engineering, 28 (3), 04014009 %G eng %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T Autonomous modeling of pipes within point clouds %A Mahmoud Ahmed %A Carl T Haas %A Ralph Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %G eng %U https://d1wqtxts1xzle7.cloudfront.net/40429675/AUTONOMOUS_MODELING_OF_PIPES_WITHIN_POIN20151127-26786-ktzdbe.pdf?1448636234=&response-content-disposition=inline%3B+filename%3DAutonomous_Modeling_of_Pipes_within_Poin.pdf&Expires=1618430672&Signature=KOYoD1 %N 1 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T A CONCEPTUAL APPROACH TO DISCOVERING KNOWLEDGE FROM CONSTRUCTION WORKFLOWS %A AJ Antony Chettupuzha %A Carl T Haas %A Joel Gray %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %P 1 %G eng %U https://www.semanticscholar.org/paper/A-Conceptual-Approach-to-Discovering-Knowledge-from-Chettupuzha-Haas/2c92b1fbcfcfaaff418c2ad854beea37fe7a1189?p2df %0 Journal Article %J Journal of Construction Engineering and Management %D 2013 %T Construction small-projects rework reduction for capital facilities %A Di Zhang %A Carl T Haas %A Paul M Goodrum %A Carlos H Caldas %A Robin Granger %B Journal of Construction Engineering and Management %V 138 %P 1377-1385 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000552 %N 12 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T DETERMINING CRITICAL CONSTRUCTION DOCUMENTS THROUGH KNOWLEDGE DISCOVERY %A AJ Antony Chettupuzha %A Carl T Haas %A Joel Gray %A Ray Simonson %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %G eng %U https://www.semanticscholar.org/paper/Determining-Critical-Construction-Documents-through-Chettupuzha-Haas/3bffdf7849dd1a36616666c031e3cb58d7766344?p2df %N 1 %0 Journal Article %J Water research %D 2013 %T Development of a system dynamics model for financially sustainable management of municipal watermain networks %A Rashid Rehan %A Mark A Knight %A Andreh JA Unger %A Carl T Haas %B Water research %V 47 %P 7184-7205 %G eng %U https://doi.org/10.1016/j.watres.2013.09.061 %N 20 %0 Journal Article %J Journal of Construction Engineering and Project Management %D 2013 %T Front End Planning Tool (FEPT) based on an electronic process management %A Mahdi Safa %A Carl T Haas %A Keith W Hipel %A Joel Gray %B Journal of Construction Engineering and Project Management %V 3 %P 1-12 %G eng %U https://doi.org/10.6106/JCEPM.2013.3.2.001 %N 2 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T How to identify the critical stakeholders in an interface management system? %A S Shokri %A CT Haas %A RCG Haas %A K Maloney %A S MacGillivray %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %G eng %U https://www.semanticscholar.org/paper/How-to-Identify-the-Critical-Stakeholders-in-an-Shokri-Haas/aa27c07e116412f5c443eedfef19edb880f86398?p2df %N 1 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T A human body posture sensor for monitoring and diagnosing MSD risk factors %A A Alwasel %A K Elrayes %A E Abdel-Rahman %A C Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %P 1 %G eng %U https://www.researchgate.net/profile/Abdullatif-Alwasel/publication/257936855_A_Human_Body_Posture_Sensor_for_Monitoring_and_Diagnosing_MSD_Risk_Factors/links/0deec52657036daf67000000/A-Human-Body-Posture-Sensor-for-Monitoring-and-Diagnosing-MSD-Risk-Fact %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T An integrated quality management system for piping fabrication using 3D laser scanning and photogrammetry %A M Safa %A M Nahangi %A A Shahi %A CT Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %P 1 %G eng %U https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.1038.8848&rep=rep1&type=pdf %0 Thesis %B Journal of Transportation Engineering, 139 (9), pp. 913-922 %D 2013 %T Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors %A Vaziri, S.H. %A Haas, C.T. %A Rothenburg, L. %A Haas, R.C. %B Journal of Transportation Engineering, 139 (9), pp. 913-922 %G eng %0 Journal Article %J Canadian Journal of Civil Engineering %D 2013 %T Investigation of the effects of air temperature and speed on performance of piezoelectric weigh-in-motion systems %A Shahram Hashemi Vaziri %A Carl T Haas %A Leo Rothenburg %A Ralph C Haas %A Xiaohua Jiang %B Canadian Journal of Civil Engineering %V 40 %P 935-944 %G eng %U https://doi.org/10.1139/cjce-2012-0227 %N 10 %0 Journal Article %J Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering %D 2013 %T Labour productivity improvement through the use of best practices for infrastructure construction projects %A H Nasir %A C Haas %A M Shahtaheri %A C Caldas %A P Goodrum %B Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering %G eng %U https://www.researchgate.net/profile/Hassan-Nasir-4/publication/289593527_Labour_productivity_improvement_through_the_use_of_best_practices_for_infrastructure_construction_projects/links/5caef0eb4585156cd78f6fdb/Labour-productivity-improvement-through-the %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T A model for implementing & continuously improving the automated change management process for construction mega projects %A Sh Karimidorabati %A CT Haas %A J Gray %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %G eng %U https://www.semanticscholar.org/paper/A-Model-for-Implementing-%26-Continuously-Improving-Karimidorabati-Haas/c1469d02555ff18336cb39de6f8d9f4f908d50a5?p2df %N 1 %0 Thesis %B Automation in Construction 30 (2013) 136–143 %D 2013 %T Onsite 3D Marking for Construction Activity Tracking %A Shahi, A. %A Haas, C. %A West, J. %B Automation in Construction 30 (2013) 136–143 %G eng %0 Journal Article %J Automation in construction %D 2013 %T Onsite 3D marking for construction activity tracking %A Arash Shahi %A Jeffrey S West %A Carl T Haas %B Automation in construction %V 30 %P 136-143 %G eng %U https://doi.org/10.1016/j.autcon.2012.11.027 %0 Journal Article %J Journal of construction engineering and management %D 2013 %T Toward automated earned value tracking using 3D imaging tools %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Journal of construction engineering and management %V 139 %P 423-433 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000629 %N 4 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2013 %T Tracking MEP installation works %A Frederic Bosche %A Yelda Turkan %A Carl T Haas %A Tiziana Chiamone %A Giorgio Vassena %A Angelo Ciribini %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 30 %P 1 %G eng %U https://core.ac.uk/reader/29177540 %0 Book Section %B Computing in Civil Engineering %D 2013 %T Tracking secondary and temporary concrete construction objects using 3D imaging technologies %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Computing in Civil Engineering %P 749-756 %G eng %U https://doi.org/10.1061/9780784413029.094 %0 Thesis %B ASCE Journal of Construction Engineering and Management, 137(12), pp. 1117-1124 %D 2012 %T Activity Analysis in Industrial Construction %A Gouett, M. %A Haas, C. %A Caldas, C. %A Goodrum, C. %B ASCE Journal of Construction Engineering and Management, 137(12), pp. 1117-1124 %G eng %0 Journal Article %J Construction Research Congress 2012: Construction Challenges in a Flat World %D 2012 %T Activity-based data fusion for automated progress tracking of construction projects %A Arash Shahi %A Jose M Cardona %A Carl T Haas %A Jeffrey S West %A Gary L Caldwell %B Construction Research Congress 2012: Construction Challenges in a Flat World %P 838-847 %G eng %U https://doi.org/10.1061/9780784412329.085 %0 Book Section %B Construction Research Congress 2012: Construction Challenges in a Flat World %D 2012 %T Assessing productivity improvement of quick connection systems in the steel construction industry using building information modeling (BIM) %A Yongwei Shan %A Paul Goodrum %A Carl Haas %A Carlos Caldas %B Construction Research Congress 2012: Construction Challenges in a Flat World %P 1135-1144 %G eng %U https://doi.org/10.1061/9780784412329.114 %0 Journal Article %J Gerontechnology %D 2012 %T Automated earned-value tracking %A Y Turkan %A F Bosché %A Carl Haas %A R Haas %B Gerontechnology %V 11 %G eng %U https://researchportal.hw.ac.uk/en/publications/automated-earned-value-tracking %N 2 %0 Thesis %B Automation in Construction 22 , pp. 414-421 %D 2012 %T Automated Progress Tracking Using 4D Schedule and 3D Sensing Technologies %A Turkan, Y. %A Bosche, F. %A Haas, R. %A Haas, C. %B Automation in Construction 22 , pp. 414-421 %G eng %0 Journal Article %J Automation in construction %D 2012 %T Automated progress tracking using 4D schedule and 3D sensing technologies %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Automation in construction %V 22 %P 414-421 %G eng %U https://doi.org/10.1016/j.autcon.2011.10.003 %0 Book Section %B Construction Research Congress 2012: Construction Challenges in a Flat World %D 2012 %T Construction Research Data Management %A Arash Shahi %A Kaitlin Carlson %A AJ Antony Chettupuzha %A Carl T Haas %A Jeffrey S West %A Burcu Akinci %B Construction Research Congress 2012: Construction Challenges in a Flat World %P 678-687 %G eng %U https://doi.org/10.1061/9780784412329.069 %0 Thesis %B ASCE Journal of Construction Engineering and Management 138 (12), pp. 1377-1385 %D 2012 %T Construction small-projects rework reduction for capital facilities %A Zhang, D. %A Haas, C. %A Goodrum, P. %A Caldas, C. %B ASCE Journal of Construction Engineering and Management 138 (12), pp. 1377-1385 %G eng %0 Journal Article %J Automation in Construction %D 2012 %T Deterioration of UWB positioning during construction %A Arash Shahi %A Afrooz Aryan %A Jeffrey S West %A Carl T Haas %A Ralph CG Haas %B Automation in Construction %V 24 %P 72-80 %G eng %U https://doi.org/10.1016/j.autcon.2012.02.009 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2012 %T Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement %A Hassan Nasir %A Carl T Haas %A Jeff H Rankin %A Aminah Robinson Fayek %A Daniel Forgues %A Janaka Ruwanpura %B Canadian Journal of Civil Engineering %V 39 %P 957-967 %G eng %U https://doi.org/10.1139/l2012-030 %N 9 %0 Thesis %B Canadian Journal of Civil Engineering 39 (9), pp. 957-967 %D 2012 %T Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement %A Nasir, H. %A Haas, C. %A Forgues, D. %A Fayek, A. %A Ruwanpura, J. %A Rankin, J. %B Canadian Journal of Civil Engineering 39 (9), pp. 957-967 %G eng %0 Patent %D 2012 %T Device for powdering printed sheets in a printing press, and printing press with a powdering device %A Claudius Haas %7 United States of America %V 13191957 %G eng %U https://patents.google.com/patent/US20120024175A1/en %& US %0 Journal Article %J Expert Systems with Applications %D 2012 %T Dislocation detection in field environments: A belief functions contribution %A Saiedeh Navabzadeh Razavi %A Emmanuel Duflos %A Carl Haas %A Philippe Vanheeghe %B Expert Systems with Applications %V 39 %P 8505-8513 %G eng %U https://doi.org/10.1016/j.eswa.2011.12.014 %N 10 %0 Book Section %B Construction Research Congress 2012: Construction Challenges in a Flat World %D 2012 %T Improving concrete trade labor productivity through the use of innovations %A Gabriel B Dadi %A Mahdi Safa %A Paul M Goodrum %A Carl T Haas %A Carlos H Caldas %A David MacNeel %B Construction Research Congress 2012: Construction Challenges in a Flat World %G eng %U https://doi.org/10.1061/9780784412329.249 %0 Journal Article %D 2012 %T Interface management model for mega capital projects %A Shokri %A Safa %A Haas %A Haas %A Maloney %A MacGillivray %G eng %U https://doi.org/10.1061/9780784412329.045 %0 Journal Article %J Transportation Research Board 91st Annual MeetingTransportation Research Board %D 2012 %T Investigation of Piezoelectric Weigh-in-Motion Sensors’ Performance in Asphalt Concrete Pavements in Cold Temperatures of Southern Ontario %A Shahram Hashemi Vaziri %A Carl Haas %A Leo Rothenburg %A Ralph Haas %B Transportation Research Board 91st Annual MeetingTransportation Research Board %G eng %U https://trid.trb.org/view/1129278 %N 12-1484 %0 Journal Article %J ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %D 2012 %T Reducing shoulder injuries among construction workers %A Abdullatif Alwasel %A Karim Elrayes %A Eihab Abdel-Rahman %A Carl Haas %B ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction %V 29 %P 1 %G eng %U https://www.semanticscholar.org/paper/Reducing-shoulder-injuries-among-construction-Alwasel-El-Rayes/849f8c5a0874255173325b97261b0f9f0bad3a97?p2df %0 Journal Article %J Journal of Computing in Civil Engineering %D 2012 %T Reliability-based hybrid data fusion method for adaptive location estimation in construction %A Saiedeh N Razavi %A Carl T Haas %B Journal of Computing in Civil Engineering %V 26 %P 1-10 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000101 %N 1 %0 Journal Article %J Construction Management and Economics %D 2012 %T Risk management for design and construction %A Samin Shokri %A Carl T Haas %B Construction Management and Economics %V 30 %P 711-713 %G eng %U https://doi.org/10.1080/01446193.2012.690883 %N 8 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2012 %T Target-focused local workspace modeling for construction automation applications %A Yong K Cho %A Chao Wang %A Pingbo Tang %A Carl T Haas %B Journal of Computing in Civil Engineering %V 26 %P 661-670 %G eng %U https://doi.org/10.1061/(ASCE)CP.1943-5487.0000166 %N 5 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2012 %T Using digital photogrammetry for pipe-works progress tracking %A Mahmoud Ahmed %A CT Haas %A Ralph Haas %B Canadian Journal of Civil Engineering %V 39 %P 1062-1071 %G eng %U https://doi.org/10.1139/l2012-055 %N 9 %0 Journal Article %D 2011 %T Accurate and Less Expensive Pavement Distress Surveying Using Multi-Photogrammetric-Output Fusion %A Mahmoud Fouad Ahmed %A Carl Haas %A Ralph Haas %G eng %U Transportation Research Board 90th Annual MeetingTransportation Research Board %N 11-4312 %0 Journal Article %J Journal of Construction Engineering and Management %D 2011 %T Activity analysis for direct-work rate improvement in construction %A Michael C Gouett %A Carl T Haas %A Paul M Goodrum %A Carlos H Caldas %B Journal of Construction Engineering and Management %V 137 %P 1117-1124 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000375 %N 12 %0 Thesis %B Journal of Construction Engineering and Management, 137 (12), pp. 1117-1124 %D 2011 %T Activity analysis for direct-work rate improvement in construction %A Gouett, M.C. %A Haas, C.T. %A Goodrum, P.M. %A Caldas, C.H. %B Journal of Construction Engineering and Management, 137 (12), pp. 1117-1124 %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000375 %0 Journal Article %J Water research %D 2011 %T Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems %A Rashid Rehan %A Mark A Knight %A Carl T Haas %A Andreh JA Unger %B Water research %V 45 %P 4737-4750 %G eng %U https://doi.org/10.1016/j.watres.2011.06.001 %N 16 %0 Thesis %B Water Research 45 (16), pp. 4737-4750 %D 2011 %T Application of System Dynamics for developing financially self-sustaining management policies for water and wastewater systems %A Rehan, R. %A Knight, M. %A Unger, A. %A Haas, C. %B Water Research 45 (16), pp. 4737-4750 %G eng %0 Journal Article %J Annual Conference of the Canadian Society for Civil Engineering %D 2011 %T Automated progress tracking of erection of concrete structures %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Annual Conference of the Canadian Society for Civil Engineering %P 2746-2756 %G eng %U https://d1wqtxts1xzle7.cloudfront.net/5279938/Automated_Progress_Tracking_of_Erection_of_Concrete_Structures_-_Turkan_et_al..pdf?response-content-disposition=inline%3B+filename%3DAutomated_Progress_Tracking_of_Erection.pdf&Expires=1618601575&Signature=apS %0 Conference Proceedings %B CSCE 3rd International/9th Construction Specialty Conference %D 2011 %T Comparison of point-cloud acquisition from laser-scanning and photogrammetry based on field experimentation %A Mahmoud Ahmed %A Adrien Guillemet %A Arash Shahi %A Carl T Haas %A Jeffrey S West %A Ralph CG Haas %B CSCE 3rd International/9th Construction Specialty Conference %P 14-17 %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=1438405169575536954&btnI=1&hl=en %0 Journal Article %J Journal of construction engineering and management %D 2011 %T Data-fusion approaches and applications for construction engineering %A Seyed Mohsen Shahandashti %A Saiedeh N Razavi %A Lucio Soibelman %A Mario Berges %A Carlos H Caldas %A Ioannis Brilakis %A Jochen Teizer %A Patricio A Vela %A Carl Haas %A James Garrett %A Burcu Akinci %A Zhenhua Zhu %B Journal of construction engineering and management %V 137 %P 863-869 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000287 %N 10 %0 Journal Article %D 2011 %T Development and implementation of a construction performance and productivity benchmarking program %A H Nasir %A C Haas %A AR Fayek %A Daniel Forgues %A J Rankin %A J Ruwanpura %V 3 %P 1896-1905 %G eng %U https://espace2.etsmtl.ca/id/eprint/4258/ %0 Journal Article %J Automation in Construction %D 2011 %T Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring %A Anu Pradhan %A Burcu Akinci %A Carl T Haas %B Automation in Construction %V 20 %P 389-398 %G eng %U https://doi.org/10.1016/j.autcon.2010.11.009 %N 4 %0 Journal Article %J Construction Management and Economics %D 2011 %T The impact of management practices on mechanical construction productivity %A Yongwei Shan %A Paul M Goodrum %A Dong Zhai %A Carl Haas %A Carlos H Caldas %B Construction Management and Economics %V 29 %P 305-316 %G eng %U https://doi.org/10.1080/01446193.2010.538070 %N 3 %0 Journal Article %J Journal of Construction Engineering and Management %D 2011 %T Improving construction supply network visibility by using automated materials locating and tracking technology %A Duncan A Young %A Carl T Haas %A Paul Goodrum %A Carlos Caldas %B Journal of Construction Engineering and Management %V 137 %P 976-984 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000364 %N 11 %0 Patent %D 2011 %T Method of controlling a powder sprayer and printing press having a powder sprayer %A Peter Theobald Blaser %A Claudius Haas %A Marius Stelter %7 United States of America %V 7942096 %G eng %U https://patents.google.com/patent/US7942096B2/en %& US %0 Journal Article %J Journal of construction engineering and management %D 2011 %T Model to predict the impact of a technology on construction productivity %A Paul M Goodrum %A Carl T Haas %A Carlos Caldas %A Dong Zhai %A Jordan Yeiser %A Daniel Homm %B Journal of construction engineering and management %V 137 %P 678-688 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000328 %N 9 %0 Conference Proceedings %B Proceedings of the 9th Construction Specialty Conference %D 2011 %T Rapid tracking of pipe-works progress using digital photogrammetry %A M Ahmed %A C Haas %A A Shahi %A A Aryan %A J West %A R Haas %B Proceedings of the 9th Construction Specialty Conference %P 14-17 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6925103191493667810 %0 Journal Article %J ISARC Proc %D 2011 %T Sensing construction work-related musculoskeletal disorders (WMSDs) %A Abdullatif Alwasel %A Karim Elrayes %A Eihab M Abdel-Rahman %A Carl Haas %B ISARC Proc %G eng %U https://www.researchgate.net/profile/Abdullatif-Alwasel/publication/234109255_Sensing_Construction_Work-Related_Musculoskeletal_Disorders_WMSDs/links/0deec5239c58dc410b000000/Sensing-Construction-Work-Related-Musculoskeletal-Disorders-WMSDs.pdf %0 Journal Article %J Canadian Journal of Civil Engineering %D 2011 %T Toward low-cost 3D automatic pavement distress surveying: the close range photogrammetry approach %A Mahmoud Ahmed %A CT Haas %A Ralph Haas %B Canadian Journal of Civil Engineering %V 38 %P 1301-1313 %G eng %U https://doi.org/10.1139/l11-088 %N 12 %0 Thesis %B Canadian Journal of Civil Engineering, 38(12), pp. 1301-1313 %D 2011 %T Toward Low-Cost 3D Automatic Pavement Distress Surveying: The Close Range Photogrammetry Approach %A Ahmed, M. %A Haas, R. %A Haas, C. %B Canadian Journal of Civil Engineering, 38(12), pp. 1301-1313 %G eng %0 Journal Article %J Automation in Construction %D 2011 %T Using reference RFID tags for calibrating the estimated locations of construction materials %A Saiedeh N Razavi %A Carl T Haas %B Automation in Construction %V 20 %P 677-685 %G eng %U https://doi.org/10.1016/j.autcon.2010.12.009 %N 6 %0 Conference Proceedings %D 2011 %T Weigh-In-Motion Sensors’ Installation and Calibration Efforts on Highway 401 Perpetual Pavements, Woodstock %A Shahram H Vaziri %A Carl Haas %A Leo Rothenburg %A Joseph Ponniah %A Ralph Haas %G eng %U https://scholar.google.ca/scholar?oi=bibs&cluster=9374466208948809651&btnI=1&hl=en %0 Thesis %B Construction Management and Economics, 28 (12), pp. 1269-1285 %D 2010 %T Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data %A Wang, Y. %A Goodrum, P.M. %A Haas, C. %A Glover, R. %A Vazari, S. %B Construction Management and Economics, 28 (12), pp. 1269-1285 %G eng %U http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.524238 %0 Book Section %B Construction Research Congress 2010: Innovation for Reshaping Construction Practice %D 2010 %T Automated materials tracking and locating: impact modeling and estimation %A D Young %A H Nasir %A S Razavi %A C Haas %A P Goodrum %A C Caldas %B Construction Research Congress 2010: Innovation for Reshaping Construction Practice %P 41-50 %G eng %U https://doi.org/10.1061/41109(373)5 %0 Journal Article %J Proc., Workshop on the Theory of Belief Functions %D 2010 %T Belief function based algorithm for material detection and tracking in construction %A Emmanuel Duflos %A Philippe Vanheeghe %A SN Razavi %A Carl Haas %B Proc., Workshop on the Theory of Belief Functions %G eng %U https://bfasociety.org/Belief2010/html/papers/p81.pdf %0 Journal Article %J 26th ARCOM Annual Conference and Annual General Meeting %D 2010 %T Fusing 4D modeling and laser scanning for automated construction progress control %A Frederic Nicolas Bosche %A Yelda Turkan %A Carl T Haas %A Ralph Haas %B 26th ARCOM Annual Conference and Annual General Meeting %P 1229-1238 %G eng %U https://researchportal.hw.ac.uk/en/publications/fusing-4d-modeling-and-laser-scanning-for-automated-construction- %0 Conference Proceedings %B Proc. of the 26th Annual Conf. Association of Researchers in Construction Management %D 2010 %T Fusing 4D modelling and laser scanning for construction schedule control %A Frederic Bosche %A Yelda Turkan %A Carl T Haas %A Ralph Haas %B Proc. of the 26th Annual Conf. Association of Researchers in Construction Management %P 1229-1238 %G eng %U https://d1wqtxts1xzle7.cloudfront.net/48932495/Bosche-2010-ARCOM.pdf?1474207991=&response-content-disposition=inline%3B+filename%3DFusing_4D_Modelling_and_Laser_Scanning_f.pdf&Expires=1618850114&Signature=P6aNtcESBsOqZHphnga9nhE6QDACMh2Tjq2kcLG7iTNIUKxIk3 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2010 %T An implementation model for automated construction materials tracking and locating %A Hassan Nasir %A Carl T Haas %A Duncan A Young %A Saiedeh Nawabzadi Razavi %A Carlos Caldas %A Paul Goodrum %B Canadian Journal of Civil Engineering %V 37 %P 588-599 %G eng %U https://doi.org/10.1139/L09-178 %N 4 %0 Journal Article %J CANADIAN JOURNAL OF CIVIL ENGINEERING %D 2010 %T An implementation model for automated construction materials tracking and locating (vol 37, pg 588, 2010) %A Hassan Nasir %A Carl T Haas %A Duncan A Young %A Saiedeh Nawabzadi Razavi %A Carlos Caldas %A Paul Goodrum %B CANADIAN JOURNAL OF CIVIL ENGINEERING %V 37 %P 929-929 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=9234848135491647709 %N 6 %0 Thesis %B Automation in Construction 19 (8), pp. 1037-1046 %D 2010 %T Multi-sensor Data Fusion for On-Site Materials Tracking in Construction %A Razavi, S. %A Haas, C. %B Automation in Construction 19 (8), pp. 1037-1046 %G eng %0 Thesis %B Automation in Construction, 19 (8), pp. 1037-1046 %D 2010 %T Multisensor data fusion for on-site materials tracking in construction %A Razavi, S.N. %A Haas, C.T. %B Automation in Construction, 19 (8), pp. 1037-1046 %G eng %U https://www.sciencedirect.com/science/article/pii/S0926580510001159 %0 Journal Article %J Transportation Research Board 89th Annual MeetingTransportation Research Board %D 2010 %T Potential of low-cost, close-range photogrammetry toward unified automatic pavement distress surveying %A Mahmoud Fouad Ahmed %A Carl Haas %B Transportation Research Board 89th Annual MeetingTransportation Research Board %G eng %U https://trid.trb.org/view/909660 %N 10-0825 %0 Conference Proceedings %B Proceedings of the 6th International Conference on Innovation in Architecture, Engineering & Construction %D 2010 %T Towards automated progress tracking of erection of concrete structures %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Proceedings of the 6th International Conference on Innovation in Architecture, Engineering & Construction %P 9-11 %G eng %U https://pure.hw.ac.uk/ws/files/785816/AEC_2010_Turkan_Y._REVISED.pdf %0 Conference Proceedings %B Proceedings, Sixth International Conference on Innovation in Architecture, Engineering and Construction %D 2010 %T Towards automated progress tracking of erection of construction of concrete structures %A Yelda Turkan %A Frederic Bosche %A Carl T Haas %A Ralph Haas %B Proceedings, Sixth International Conference on Innovation in Architecture, Engineering and Construction %G eng %U http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.716.4785 %0 Journal Article %J Journal of construction engineering and management %D 2009 %T Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the US industrial construction sector %A Yinggang Wang %A Paul M Goodrum %A Carl T Haas %A Robert W Glover %B Journal of construction engineering and management %V 135 %P 999-1008 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000072 %N 10 %0 Journal Article %J Automation in construction %D 2009 %T Assessing the impact of materials tracking technologies on construction craft productivity %A David Grau %A Carlos H Caldas %A Carl T Haas %A Paul M Goodrum %A Jie Gong %B Automation in construction %V 18 %P 903-911 %G eng %U https://doi.org/10.1016/j.autcon.2009.04.001 %N 7 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2009 %T Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control %A Frederic Bosche %A Carl T Haas %A Burcu Akinci %B Journal of Computing in Civil Engineering %V 23 %P 311-318 %G eng %U https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(311) %N 6 %0 Journal Article %J Proc, the International Symposium for Automation and Robotics in Construction (ISARC) %D 2009 %T A data fusion model for location estimation in construction.‖ %A SN Razavi %A C Haas %B Proc, the International Symposium for Automation and Robotics in Construction (ISARC) %G eng %U https://www.researchgate.net/profile/Seyed-Naser-Razavi/publication/239594768_A_Data_Fusion_Model_for_Location_Estimation_in_Construction/links/5a15ca6c4585153b546cb278/A-Data-Fusion-Model-for-Location-Estimation-in-Construction.pdf %0 Journal Article %J Procs 26th International Symposium on Automation and Robotics in Construction (ISARC) %D 2009 %T Impact of fast automated tracking of construction components on labor productivity %A David Grau %A Carlos H Caldas %A Carl T Haas %A Paul M Goodrum %A Jie Gong %B Procs 26th International Symposium on Automation and Robotics in Construction (ISARC) %G eng %U https://www.semanticscholar.org/paper/Impact-of-fast-automated-tracking-of-construction-Grau-Caldas/b47300909c7f7c2b34c66630a5acdea0cb1c3105?p2df %0 Conference Proceedings %B 2009 Annual Conference and Exhibition of the Transportation Association of Canada-Transportation in a Climate of Change %D 2009 %T Improvements in Piezoelectric Sensors and Weigh-in-Motion Data Collection Technology %A XH Jiang %A SH VAZIRI %A C Haas %A L Rothenburg %A G Kennepohl %A R Haas %B 2009 Annual Conference and Exhibition of the Transportation Association of Canada-Transportation in a Climate of Change %G eng %U https://trid.trb.org/view/911640 %0 Conference Proceedings %B Proceedings of the 2009 Annual Conference of the Transportation Association of Canada %D 2009 %T Improvements in piezoelectric sensors and WIM data collection technology %A Xiaohua Jiang %A Shhram H Vaziri %A Carl Haas %A Leo Rothenburg %A Gerhard Kennepohl %A R Haas %B Proceedings of the 2009 Annual Conference of the Transportation Association of Canada %G eng %U http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2009/pdf/Jiang.pdf %0 Journal Article %J Managing IT in Construction/Managing Construction for Tomorrow %D 2009 %T Leveraging Materials Tracking Technologies to Improve Industrial Project Performance %A D Grau %A CH Caldas %A CT Haas %A PM Goodrum %A J Gong %B Managing IT in Construction/Managing Construction for Tomorrow %P 181 %G eng %U https://books.google.ca/books?hl=en&lr=&id=B0NZDwAAQBAJ&oi=fnd&pg=PA181&ots=dCFhSJ5ZO5&sig=P1q3NKkiXOp2dEPfM8noLUcRz9k#v=onepage&q&f=false %0 Journal Article %J Journal of construction engineering and management %D 2009 %T Measuring the impact of rework on construction cost performance %A Bon-Gang Hwang %A Stephen R Thomas %A Carl T Haas %A Carlos H Caldas %B Journal of construction engineering and management %V 135 %P 187-198 %G eng %U https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187) %N 3 %0 Thesis %B Journal of Construction Engineering and Management, 135 (3), pp. 187-198 %D 2009 %T Measuring the impact of rework on construction cost performance %A Hwang, B.G. %A Thomas, S.R. %A Haas, C.T. %A Caldas, C.H. %B Journal of Construction Engineering and Management, 135 (3), pp. 187-198 %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29 %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198 %D 2009 %T Measuring the Impacts of Rework on Construction Cost Performance %A Hwang, B. %A Thomas, S. %A Haas, C. %A Caldas, C. %B ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198 %G eng %0 Conference Proceedings %B 2009 12th International Conference on Information Fusion %D 2009 %T Real world implementation of belief function theory to detect dislocation of materials in construction %A Saiedeh N Razavi %A Carl T Haas %A Philippe Vanheeghe %A Emmanuel Duflos %B 2009 12th International Conference on Information Fusion %P 748-755 %G eng %U https://ieeexplore.ieee.org/abstract/document/5203803 %0 Journal Article %J Journal of Construction Engineering and Management %D 2009 %T Relationship between automation and integration of construction information systems and labor productivity %A Dong Zhai %A Paul M Goodrum %A Carl T Haas %A Carlos H Caldas %B Journal of Construction Engineering and Management %V 135 %P 746-753 %G eng %U https://doi.org/10.1061/(ASCE)CO.1943-7862.0000024 %N 8 %0 Thesis %B ASCE JCEM, Vol. 135, no. 8 %D 2009 %T The Relationship between Automation and Integration of Construction Information Systems and Labor Productivity %A Zhai, D. %A Goodrum, P. %A Haas, C. %A Caldas, C. %B ASCE JCEM, Vol. 135, no. 8 %G eng %0 Patent %D 2009 %T Spray nozzle and method for dusting freshly printed products %A Rainer Haas %A Nicolas Martin %A Jürgen Ehrhard %A Detlev Berlingen %A Claudius Haas %7 United States of America %V 7607391 %G eng %U https://patents.google.com/patent/US7607391B2/en %& US %0 Journal Article %J Journal of management in engineering %D 2009 %T Understanding and interpreting baseline perceptions of sustainability in construction among civil engineers in the United States %A Wai Kiong Chong %A Sanat Kumar %A Carl T Haas %A Salwa M Beheiry %A Lonnie Coplen %A Marvin Oey %B Journal of management in engineering %V 25 %P 143-154 %G eng %U https://doi.org/10.1061/(ASCE)0742-597X(2009)25:3(143) %N 3 %0 Journal Article %J The 25th International Symposium on Automation and Robotics in Construction Vilnius %D 2008 %T Automated 3D data collection (A3DDC) for 3D building information modeling %A Frederic Bosche %A Carl T Haas %B The 25th International Symposium on Automation and Robotics in Construction Vilnius %G eng %U https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.716.4829&rep=rep1&type=pdf %0 Thesis %B Journal of Automation in Construction, Elsevier, New-York, USA, Volume 17, Issue 4, pp 499-512 %D 2008 %T Automated Retrieval of 3D CAD Model Objects in Construction 3D Images %A Bosche, F. %A Haas, C.T. %B Journal of Automation in Construction, Elsevier, New-York, USA, Volume 17, Issue 4, pp 499-512 %G eng %0 Journal Article %J Automation in Construction %D 2008 %T Automated retrieval of 3D CAD model objects in construction range images %A F Bosché %A Carl T Haas %B Automation in Construction %V 17 %P 499-512 %G eng %U https://doi.org/10.1016/j.autcon.2007.09.001 %N 4 %0 Journal Article %J Journal of Information Technology in Construction %D 2008 %T Automated retrieval of project three-dimensional CAD objects in range point clouds to support automated dimensional QA/QC %A Frederic N Bosche %A Carl T Haas %B Journal of Information Technology in Construction %V 13 %P 71-85 %G eng %U https://www.researchgate.net/profile/Frederic-Bosche/publication/238623222_Automated_retrieval_of_project_three-dimensional_CAD_objects_in_range_point_clouds_to_support_automated_dimensional_QAQC/links/0deec528201db223e9000000/Automated-retrieval-of-proje %N 6 %0 Journal Article %J Journal of construction engineering and management %D 2008 %T Craft training issues in American industrial and commercial construction %A Yinggang Wang %A Paul M Goodrum %A Carl T Haas %A Robert W Glover %B Journal of construction engineering and management %V 134 %P 795-803 %G eng %U https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(795) %N 10 %0 Journal Article %J Transportation research record %D 2008 %T Development of frost and thaw depth predictors for decision making about variable load restrictions %A Sarah Baiz %A Susan L Tighe %A Carl T Haas %A Brian Mills %A Max Perchanok %B Transportation research record %V 2053 %P 1-8 %G eng %U https://doi.org/10.3141%2F2053-01 %N 1 %0 Journal Article %J Transportation Association of Canada %D 2008 %T Evaluation of the Economic Feasibility of Weigh-In-Motion in Canada %A Lixin Alanna Zhang %A Carl Haas %A Susan L Tighe %B Transportation Association of Canada %G eng %U https://www.researchgate.net/profile/Carl-Haas/publication/241513202_Evaluation_of_the_Economic_Feasibility_of_Weigh-In-Motion_in_Canada/links/571a2c8808ae6eb94d0c734f/Evaluation-of-the-Economic-Feasibility-of-Weigh-In-Motion-in-Canada.pdf %0 Conference Proceedings %B CSCE 2008 conference %D 2008 %T Field trial of automated material tracking in construction %A SN Razavi %A D Young %A H Nasir %A C Haas %A C Caldas %A P Goodrum %A P Murray %B CSCE 2008 conference %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6221283060680869399 %0 Thesis %B Canadian Journal of Civil Engineering, 35 (9), pp. 894-907 %D 2008 %T Initial metrics and pilot program results for measuring the performance of the Canadian construction industry %A Rankin, J. %A Fayek, A.R. %A Meade, G. %A Haas, C. %A Manseau, A. %B Canadian Journal of Civil Engineering, 35 (9), pp. 894-907 %G eng %0 Conference Proceedings %B CSCE 2008 Annual Conference %D 2008 %T Performance of automated project progress tracking with 3D data fusion %A F Bosché %A Carl T Haas %A Paul Murray %B CSCE 2008 Annual Conference %G eng %U https://pure.hw.ac.uk/ws/files/785787/CSCE_2008_CO_449_Final.pdf %0 Conference Proceedings %B 2008 Annual Conference of the Transportation Association of CanadaTransportation Association of Canada %D 2008 %T Sustainability of Pavement Research Programs Through Knowledge Management, Realistic Policy Objectives, and Quantifiable Performance Measures %A SL TIGHE %A Carl Haas %A Ralph Haas %A Gerhard Kennepohl %B 2008 Annual Conference of the Transportation Association of CanadaTransportation Association of Canada %G eng %U https://trid.trb.org/view/877071 %0 Journal Article %J Traitement du Signal %D 2007 %T Application du TBM pour la localisation de noeuds de communication à partir de mesures de proximité %A Francois Caron %A Emmanuel Duflos %A Carl Haas %A Philippe Vanheeghe %B Traitement du Signal %G eng %U http://hdl.handle.net/2042/8917 %0 Journal Article %J TRAITEMENT DU SIGNAL %D 2007 %T Application of the TBM to the communication nodes localization using proximity measures %A Francois Caron %A Emmanuel Duflos %A Carl Haas %A Philippe Vanheeghe %B TRAITEMENT DU SIGNAL %V 24 %P 153-164 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=4475661154712431380 %N 2 %0 Journal Article %J Research Summary, Construction Industry Institute (CII) %D 2007 %T Construction industry craft training in the United States and Canada %A P Goodrum %A Yinggang Wang %A C Haas %A R Glover %A S Vaziri %B Research Summary, Construction Industry Institute (CII) %G eng %U https://www.curt.org/wp-content/uploads/2018/12/RT-231-1-Value-of-Craft-Training-Research-Detailed-Report.pdf %0 Journal Article %J Annual Conference of the Transportation Association of Canada %D 2007 %T Evaluating weigh-in-motion sensing technology for traffic data collection %B Annual Conference of the Transportation Association of Canada %P 1-17 %G eng %U https://www.researchgate.net/profile/Carl-Haas/publication/228452225_Evaluating_Weigh-In-Motion_Sensing_Technology_for_Traffic_Data_Collection/links/571a2c8808aee3ddc568ef7c/Evaluating-Weigh-In-Motion-Sensing-Technology-for-Traffic-Data-Collection.pdf %0 Journal Article %J Automation in construction %D 2007 %T Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot %A JW Seo %A Carl Haas %A Kamel Saidi %B Automation in construction %V 16 %P 96-106 %G eng %U https://doi.org/10.1016/j.autcon.2005.12.002 %N 1 %0 Journal Article %J Journal of construction engineering and management %D 2007 %T History and renaissance of construction engineering and management in Canada %A Carl Haas %A Lloyd Waugh %A Thomas Froese %B Journal of construction engineering and management %V 133 %P 678-683 %G eng %U https://doi.org/10.1061/(ASCE)0733-9364(2007)133:9(678) %N 9 %0 Journal Article %D 2007 %T Investigation for Traffic Monitoring Equipment Evaluation Facility %A Dan Middleton %A Ronald P White %A Jason Crawford %A Ricky T Parker %A Jongchul Song %A Carl T Haas %G eng %U https://trid.trb.org/view/804183 %0 Journal Article %J Autonomous Robots %D 2007 %T Locating sensor nodes on construction projects %A Francois Caron %A Saiedeh Navabzadeh Razavi %A Jongchul Song %A Philippe Vanheeghe %A Emmanuel Duflos %A Carlos Caldas %A Carl Haas %B Autonomous Robots %V 22 %P 255-263 %G eng %U https://link.springer.com/article/10.1007/s10514-006-9720-1 %N 3 %0 Book Section %B 2007 ASCE Construction Research Congress %D 2007 %T Metric for Automated Detection and Identification of 3D CAD Elements in 3D Scanned Data %A Frederic Bosche %A Carl T Haas %B 2007 ASCE Construction Research Congress %G eng %U http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.717.7969&rep=rep1&type=pdf %0 Journal Article %J Revue Traitement du Signal %D 2007 %T Modélisation de mesures de proximité par la théorie des fonctions de croyance %A Francois Caron %A E Duflos %A C Haas %A P Vanheeghe %B Revue Traitement du Signal %V 4 %G eng %U https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=5104425499450590605 %N 2 %0 Journal Article %J Advanced Engineering Informatics %D 2007 %T A proximity-based method for locating RFID tagged objects %A Jongchul Song %A Carl T Haas %A Carlos H Caldas %B Advanced Engineering Informatics %V 21 %P 367-376 %G eng %U https://doi.org/10.1016/j.aei.2006.09.002 %N 4 %0 Thesis %B Journal of Construction Engineering and Management 133 (11), pp. 880-888 %D 2007 %T Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources %A Teizer, J. %A Caldas, C.H. %A Haas, C.T. %B Journal of Construction Engineering and Management 133 (11), pp. 880-888 %G eng %0 Book Section %B Computing in Civil Engineering %D 2007 %T Towards automated retrieval of 3D designed data in 3D sensed data %A F Bosché %A CT Haas %B Computing in Civil Engineering %P 648-656 %G eng %U https://doi.org/10.1061/40937(261)77 %0 Journal Article %D 2007 %T Using Road Weather Information Systems (RWIS) to control load restrictions on gravel and surface-treated highways %A Susan Louise Tighe %A Brian Mills %A Carl T Haas %A Sarah Baiz %G eng %U https://trid.trb.org/view/890581 %0 Thesis %B Automation in Construction, Vol. 15/2, pp 166-177 %D 2006 %T Automating The Task of Tracking the Delivery and Receipt of Fabricated Pipe Spools in Industrial Projects %A Song, J. %A Haas, C. %A Caldas, C. %A Ergen, E. %A Akinci, B. %B Automation in Construction, Vol. 15/2, pp 166-177 %G eng %0 Thesis %B ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392 %D 2006 %T Examining Business Impact of Owner Commitment to Sustainability %A Beheiry %A Salwa M. %A Chong, Wai Kiong %A Haas, Carl T. %B ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392 %G eng %0 Thesis %B ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186 %D 2006 %T Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation %A Kim, C. %A Haas, C. %A Liapi, K. %A Caldas, C. %B ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186 %G eng %0 Thesis %B Autonomous Robots, 10.1007/s10514-006-9720-1 %D 2006 %T Locating Sensor Nodes on Construction Projects %A Caron, F. %A Razavi, S. %A Song, J. %A Vanheeghe, P. %A Duflos, E. %A Caldas, C. %A Haas, C. %B Autonomous Robots, 10.1007/s10514-006-9720-1 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 131, no. 6, pp. 723-733 %D 2005 %T Considering Prework on Industrial Projects %A Song, J. %A Fagerlund, W. %A Haas, C. %A Vanegas, J. %A Tatum, C. %B ASCE Journal of Construction Engineering and Management, Vol. 131, no. 6, pp. 723-733 %G eng %0 Thesis %B Automation in Construction, Vol 14/5, pp.666-684 %D 2005 %T Rapid, On-Site Spatial Information Acquisition and its Use for Infrastructure Operation and Maintenance %A Kim, C. %A Haas, C. %A Liapi, K. %B Automation in Construction, Vol 14/5, pp.666-684 %G eng %0 Thesis %B ASCE Journal of Computing in Civil Engineering, vol. 18, issue 1, pp. 58-64 %D 2004 %T Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network %A Kim, H. %A Rauch, A.F. %A Haas, C. %B ASCE Journal of Computing in Civil Engineering, vol. 18, issue 1, pp. 58-64 %G eng %0 Thesis %B Automation in Construction 13, pp. 67-81 %D 2004 %T Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds %A Kwon %A Bosche %A Kim %A Haas %A Liapi %B Automation in Construction 13, pp. 67-81 %G eng %0 Thesis %B Computer-Aided Civil and Infrastructure Engineering, pp. 242-253, no. 18 %D 2003 %T Rapid Geometric Modeling for Unstructured Construction Workspaces %A Cho, Y.K. %A Haas, C.T. %B Computer-Aided Civil and Infrastructure Engineering, pp. 242-253, no. 18 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 128, No. 2, pp. 103-109 %D 2002 %T Assignment and Allocation Optimization of a Partially Multiskilled Workforce %A Gomar, J. %A Haas, C. %A Morton, D. %B ASCE Journal of Construction Engineering and Management, Vol. 128, No. 2, pp. 103-109 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472 %D 2002 %T Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry %A Goodrum, P. %A Haas, C. %B ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 126, No. 2, pp. 97-104 %D 2000 %T U.S. Construction Labor Productivity Trends from 1970 - 1998 %A Allmon, E. %A Haas, C. %A Borcherding, J. %A Goodrum, P. %B ASCE Journal of Construction Engineering and Management, Vol. 126, No. 2, pp. 97-104 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 124, No. 6, pp. 480-489 %D 1998 %T Multiskilled Labor Utilization Strategies in Construction %A Burleson, R. %A Haas, C. %A Tucker, R. %B ASCE Journal of Construction Engineering and Management, Vol. 124, No. 6, pp. 480-489 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 122, No. 4, pp. 354-362 %D 1996 %T Multiple Heavy Lifts Optimization %A Lin, K. %A Haas, C. %B ASCE Journal of Construction Engineering and Management, Vol. 122, No. 4, pp. 354-362 %G eng %0 Thesis %B ASCE Journal of Construction Engineering and Management, 119(3), pp. 498-515 %D 1993 %T Computer Aided Planning for Heavy Lifts %A Hornaday, W. %A Haas, C. %A O'Connor, J. %A Wen, J. %B ASCE Journal of Construction Engineering and Management, 119(3), pp. 498-515 %G eng %0 Thesis %B The National Research Council's Transportation Research Record, No. 1311, pp. 92-102 %D 1991 %T Integration of Diverse Technologies for Pavement Sensing %A Haas C. %A Hendrickson C. %B The National Research Council's Transportation Research Record, No. 1311, pp. 92-102 %G eng