Publications
A human body posture sensor for monitoring and diagnosing MSD risk factors. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). An integrated quality management system for piping fabrication using 3D laser scanning and photogrammetry. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). Tracking MEP installation works. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). Front End Planning Tool (FEPT) based on an electronic process management. Journal of Construction Engineering and Project Management, 3(2), 1-12. Retrieved from
. (2013). Autonomous modeling of pipes within point clouds. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013). A CONCEPTUAL APPROACH TO DISCOVERING KNOWLEDGE FROM CONSTRUCTION WORKFLOWS. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from
. (2013). A model for implementing & continuously improving the automated change management process for construction mega projects. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013). How to identify the critical stakeholders in an interface management system?. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013). DETERMINING CRITICAL CONSTRUCTION DOCUMENTS THROUGH KNOWLEDGE DISCOVERY. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from
. (2013). Labour productivity improvement through the use of best practices for infrastructure construction projects. Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering. Retrieved from
. (2013). Onsite 3D marking for construction activity tracking. Automation in construction, 30, 136-143. Retrieved from
. (2013). Toward automated earned value tracking using 3D imaging tools. Journal of construction engineering and management, 139(4), 423-433. Retrieved from
. (2013). Development of a system dynamics model for financially sustainable management of municipal watermain networks. Water research, 47(20), 7184-7205. Retrieved from
. (2013). Automatic Detection of Cylindrical Objects in Built Facilities. Computing in Civil Engineering, 28 (3), 04014009.
. (2013). Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors. Journal of Transportation Engineering, 139 (9), pp. 913-922.
. (2013). Onsite 3D Marking for Construction Activity Tracking. Automation in Construction 30 (2013) 136–143.
. (2013). Reliability-based hybrid data fusion method for adaptive location estimation in construction. Journal of Computing in Civil Engineering, 26(1), 1-10. Retrieved from
. (2012). Reducing shoulder injuries among construction workers. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 29, 1. Retrieved from
. (2012). Investigation of Piezoelectric Weigh-in-Motion Sensors’ Performance in Asphalt Concrete Pavements in Cold Temperatures of Southern Ontario. Transportation Research Board 91st Annual MeetingTransportation Research Board, (12-1484). Retrieved from
. (2012). Construction Research Data Management. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 678-687). Retrieved from
. (2012).