%0 Thesis %B Automation in Construction 30 (2013) 136–143 %D 2013 %T Onsite 3D Marking for Construction Activity Tracking %A Shahi, A. %A Haas, C. %A West, J. %B Automation in Construction 30 (2013) 136–143 %G eng