Automated removal of planar clutter from 3D point clouds for improving industrial object recognition. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from
. (2016). Arbitrary 3D object extraction from cluttered laser scans using local features. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from
. (2016). Applying the Concept of Selective Assembly to Modular Construction to Mitigate Impacts of Component Variability. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33(1). Retrieved from
. (2016). . (2016). A stochastic simulation approach for the integration of risk and uncertainty into megaproject cost and schedule estimates. In Construction Research Congress 2016 (pp. 607-615). Retrieved from
. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2). Retrieved from
. (2016). Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2). Retrieved from
. (2016). Automatic realignment of defective assemblies using an inverse kinematics analogy. Journal of Computing in Civil Engineering, 30(2). Retrieved from
. (2016). Improving process conformance with industry foundation processes (IFP). Advanced Engineering Informatics, 30(2), 143-156. Retrieved from
. (2016). Algorithm for Determining the Criticality of Documents within a Construction Information System. Journal of Computing in Civil Engineering, 30(3). Retrieved from
. (2016). An integrated productivity-practices implementation index for planning the execution of infrastructure projects. Journal of Infrastructure Systems, 22(2). Retrieved from
. (2016). RESILIENT INFRASTRUCTURE. Retrieved from
. (2016). RESILIENT INFRASTRUCTURE. Retrieved from
. (2016). Parallel systems and structural frames realignment planning and actuation strategy. Journal of Computing in Civil Engineering, 30(4). Retrieved from
. (2016). Optimizing contractor selection for construction packages in capital projects. Journal of Computing in Civil Engineering, 30(5). Retrieved from
. (2016). Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from
. (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from
. (2016). Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project. Modular and Offsite Construction (MOC) Summit Proceedings.
. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from
. (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from
. (2016).