Publications

Search
Author Title Type [ Year(Desc)]
2015
Petreucean, V. , Armeni, I. , Nahangi, M. , Yeung, J. , Brilakis, I. , & Haas, C. . (2015). State of research in automatic as-built modelling. Advanced Engineering Informatics, 29 (2), pp. 162-171. Retrieved from
2016
Shan, Y. , Zhai, D. , Goodrum, P. M. , Haas, C. T. , & Caldas, C. H. . (2016). Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects. Journal of Management in Engineering, 32(1). Retrieved from
Nahangi, M. , & Haas, C. T. . (2016). Skeleton-based discrepancy feedback for automated realignment of industrial assemblies. Automation in construction, 61, 147-161. Retrieved from
Ryu, J. H. , Seo, J. O. , Liu, M. , Lee, S. H. , & Haas, C. T. . (2016). Action recognition using a wristband-type activity tracker: Case study of masonry work. In Construction Research Congress 2016 (pp. 790-799). Retrieved from
Czerniawski, T. , Nahangi, M. , Walbridge, S. , & Haas, C. . (2016). Automated removal of planar clutter from 3D point clouds for improving industrial object recognition. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from
Nahangi, M. , Czerniawski, T. , Rausch, C. , & Haas, C. T. . (2016). Arbitrary 3D object extraction from cluttered laser scans using local features. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33, 1. Retrieved from
Rausch, C. , Nahangi, M. , Perreault, M. , Haas, C. , & West, J. . (2016). Applying the Concept of Selective Assembly to Modular Construction to Mitigate Impacts of Component Variability. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 33(1). Retrieved from
Haas, C. . (2016). Innovation in Construction Health, Safety and Environmental Research. Retrieved from
Shahtaheri, M. , Haas, C. T. , & Salimi, T. . (2016). A stochastic simulation approach for the integration of risk and uncertainty into megaproject cost and schedule estimates. In Construction Research Congress 2016 (pp. 607-615). Retrieved from
Shokri, S. , Haas, C. T. , Haas, R. C. G. , & Lee, S. Hyun. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2). Retrieved from
Shokri, S. , Ahn, S. , Lee, S. , Haas, C. T. , & Haas, R. C. G. . (2016). Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2). Retrieved from
Nahangi, M. , Haas, C. T. , West, J. , & Walbridge, S. . (2016). Automatic realignment of defective assemblies using an inverse kinematics analogy. Journal of Computing in Civil Engineering, 30(2). Retrieved from
Golzarpoor, B. , Haas, C. T. , & Rayside, D. . (2016). Improving process conformance with industry foundation processes (IFP). Advanced Engineering Informatics, 30(2), 143-156. Retrieved from
Chettupuzha, A. J. , & Haas, C. T. . (2016). Algorithm for Determining the Criticality of Documents within a Construction Information System. Journal of Computing in Civil Engineering, 30(3). Retrieved from
Nasir, H. , Haas, C. T. , Caldas, C. H. , & Goodrum, P. M. . (2016). An integrated productivity-practices implementation index for planning the execution of infrastructure projects. Journal of Infrastructure Systems, 22(2). Retrieved from
Rausch, C. T. , Nahangi, M. , Haas, C. , West, J. , & Perreault, M. . (2016). RESILIENT INFRASTRUCTURE. Retrieved from
Sharif, M. - M. , Nahangi, M. , Haas, C. , West, J. , & Ibrahim, M. . (2016). RESILIENT INFRASTRUCTURE. Retrieved from
Nahangi, M. , Czerniawski, T. , Haas, C. T. , Walbridge, S. , & West, J. . (2016). Parallel systems and structural frames realignment planning and actuation strategy. Journal of Computing in Civil Engineering, 30(4). Retrieved from
Safa, M. , Yee, M. - H. , Rayside, D. , & Haas, C. T. . (2016). Optimizing contractor selection for construction packages in capital projects. Journal of Computing in Civil Engineering, 30(5). Retrieved from
Karimidorabati, S. , Haas, C. T. , & Gray, J. . (2016). Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from

Pages