Publications
Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from
. (2016). Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project. Modular and Offsite Construction (MOC) Summit Proceedings.
. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from
. (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from
. (2016). Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from
. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from
. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142 (2). Retrieved from
. (2016). Skeleton-based discrepancy feedback for automated realignment of industrial assemblies. Automation in Construction, volume: 61, p: 147-161. Retrieved from
. (2016). Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor, Automation in Construction. Automation in Construction, volume: 71, p: 346-358. Retrieved from
. (2016). Optimum assembly planning for modular construction components. Journal of computing in civil engineering, 31(1). Retrieved from
. (2017). Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement. Canadian Journal of Civil Engineering, 44(7), 518-529. Retrieved from
. (2017). Fatigue detection using phase-space warping. Journal of Biomechanical Engineering, 139(3). Retrieved from
. (2017). Understanding the total life cycle cost implications of reusing structural steel. Environment Systems and Decisions, 37(1), 101-120. Retrieved from
. (2017). Dimensional variability analysis of construction assemblies using kinematics chains and building information model, 34. Retrieved from
. (2017). An overview on integrating interface management and building information management systems. In 6th CSCE-CRC International Construction Specialty Conference 2017 (pp. 196-205). Retrieved from
. (2017). Level-of-Expertise Classification for Identifying Safe and Productive Masons. In Computing in Civil Engineering (pp. 359-368). Retrieved from
. (2017). Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), 50-64. Retrieved from
. (2017). A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management. Retrieved from
. (2017). Improving sustainable office building operation by using historical data and linear models to predict energy usage. Sustainable Cities and Society, 29, 107-117. Retrieved from
. (2017). Exploratory study on the effectiveness of interface-management practices in dealing with project complexity in large-scale engineering and construction projects. Journal of Management in Engineering, 33(2). Retrieved from
. (2017).