Publications
Jerk as an indicator of physical exertion and fatigue. Automation in Construction, 104, 120-128. Retrieved from
. (2019). Deconstruction programming for adaptive reuse of buildings. Automation in Construction, 107. Retrieved from
. (2019). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from
. (2020). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from
. (2020). A selective disassembly multi-objective optimization approach for adaptive reuse of building components. Resources, Conservation and Recycling, 154. Retrieved from
. (2020). Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), 471-508. Retrieved from
. (2020). Geometric accuracy of digital twins for structural health monitoring. In Bridge Engineering. IntechOpen. Retrieved from
72444.pdf
. (2020). Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario. Journal of Cleaner Production, 259. Retrieved from
. (2020). Benchmarking and improving dimensional quality on modular construction projects–A case study. International Journal of Industrialized Construction, 1(1), 2-21. Retrieved from
benchmarking_and_improving_dimensional_quality_on_modular_construction_projects-a_case_study.pdf
. (2020). Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management. Retrieved from
. (2020). Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason’s risk hump. Journal of Construction Engineering and Management, 146(8). Retrieved from
. (2020). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from
. (2020). Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study. In Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 330-338). American Society of Civil Engineers. Retrieved from
. (2020). A building information modeling approach for adaptive reuse building projects. In Construction Research Congress 2020: Infrastructure Systems and Sustainability (pp. 552-561). American Society of Civil Engineers. Retrieved from
. (2020). Computational algorithms for digital twin support in construction. In Construction Research Congress 2020: Computer Applications (pp. 191-200). American Society of Civil Engineers. Retrieved from
. (2020). Health and productivity impact of semi-automated work systems in construction. Automation in Construction, 120, 103396. Retrieved from
. (2020). A definition framework for building adaptation projects. Sustainable Cities and Society, 63, 102345. Retrieved from
. (2020). Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation.
. (2021). A computational methodology for generating modular design options for building extensions. Automation in Construction, 127, 103700.
. (2021). Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and NestingAuthorsChris Rausch, Benjamin Sanchez, Carl Haa. Journal of Construction Engineering and Management, 147(7), 05021006.
. (2021).