%0 Journal Article %J Canadian Journal of Civil Engineering %D 2017 %T Economic optimization for the rehabilitation of co-located mixed assets %A Saad, D.A. %A Hegazy, T. %B Canadian Journal of Civil Engineering %V 44 %P 820-828 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-85031907132&doi=10.1139%2fcjce-2016-0509&partnerID=40&md5=fbf0e7b5f4ea3b7177df771f51b84b8b %R 10.1139/cjce-2016-0509 %0 Journal Article %J Journal of Construction Engineering and Management %D 2016 %T Flexible Activity Relations to Support Optimum Schedule Acceleration %A Abuwarda, Z. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 142 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84991694105&doi=10.1061%2f%28ASCE%29CO.1943-7862.0001193&partnerID=40&md5=99d6dad98046f9f0b11e36086c45be43 %R 10.1061/(ASCE)CO.1943-7862.0001193 %0 Journal Article %J Journal of Infrastructure Systems %D 2016 %T Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics %A Rashedi, R. %A Hegazy, T. %B Journal of Infrastructure Systems %V 22 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84958581740&doi=10.1061%2f%28ASCE%29IS.1943-555X.0000273&partnerID=40&md5=c447d8df22b2b143a9771891c9f4479e %R 10.1061/(ASCE)IS.1943-555X.0000273 %0 Journal Article %J Structure and Infrastructure Engineering %D 2016 %T Strategic policy analysis for infrastructure rehabilitation using system dynamics %A Rashedi, R. %A Hegazy, T. %B Structure and Infrastructure Engineering %V 12 %P 667-681 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84959870972&doi=10.1080%2f15732479.2015.1038723&partnerID=40&md5=4384c1f5376623be23ffc6d4339fd2bd %R 10.1080/15732479.2015.1038723 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2016 %T Work-Package Planning and Schedule Optimization for Projects with Evolving Constraints %A Abuwarda, Z. %A Hegazy, T. %B Journal of Computing in Civil Engineering %V 30 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84992170375&doi=10.1061%2f%28ASCE%29CP.1943-5487.0000587&partnerID=40&md5=a1cd2e1c740c8a108c659c74570d4967 %R 10.1061/(ASCE)CP.1943-5487.0000587 %0 Journal Article %J Journal of Management in Engineering %D 2015 %T Behavioral economic concepts for funding infrastructure rehabilitation %A Saad, D.A. %A Hegazy, T. %B Journal of Management in Engineering %V 31 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84939552666&doi=10.1061%2f%28ASCE%29ME.1943-5479.0000332&partnerID=40&md5=719a93fd58d8c41dca7a626fe8bce4f1 %R 10.1061/(ASCE)ME.1943-5479.0000332 %0 Journal Article %J Structure and Infrastructure Engineering %D 2015 %T Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools %A Rashedi, R. %A Hegazy, T. %B Structure and Infrastructure Engineering %V 11 %P 253-262 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84914687467&doi=10.1080%2f15732479.2013.866968&partnerID=40&md5=eeb958e0246c122962d204c5c0d03bef %R 10.1080/15732479.2013.866968 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2015 %T Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings %A Hegazy, T. %A Gad, W. %B Journal of Computing in Civil Engineering %V 29 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84939429906&doi=10.1061%2f%28ASCE%29CP.1943-5487.0000351&partnerID=40&md5=86492ab2dd34a6506923b11a63643989 %R 10.1061/(ASCE)CP.1943-5487.0000351 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2015 %T Enhanced benefit-cost analysis for infrastructure fund allocation %A Saad, D.A. %A Hegazy, T. %B Canadian Journal of Civil Engineering %V 42 %P 89-97 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84922933442&doi=10.1139%2fcjce-2014-0281&partnerID=40&md5=6520cbca49d79c1153cddc1fb2e19a1a %R 10.1139/cjce-2014-0281 %0 Journal Article %J Journal of Facilities Management %D 2015 %T Microeconomic optimization and what-if analysis for facilities renewal %A Saad, D.A. %A Hegazy, T. %B Journal of Facilities Management %V 13 %P 350-365 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019682358&doi=10.1108%2fJFM-10-2014-0034&partnerID=40&md5=4c61cc9a7e5038c0b4aa3a9cbb0bc6af %R 10.1108/JFM-10-2014-0034 %0 Journal Article %J Journal of Management in Engineering %D 2015 %T Multimode resource-constrained scheduling and leveling for practical-size projects %A Menesi, W. %A Hegazy, T. %B Journal of Management in Engineering %V 31 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84936858332&doi=10.1061%2f%28ASCE%29ME.1943-5479.0000338&partnerID=40&md5=df4c5a5c7e41682ed9283ed7ea2355fb %R 10.1061/(ASCE)ME.1943-5479.0000338 %0 Journal Article %J International Journal of Mathematical Models and Methods in Applied Sciences %D 2015 %T Multiple-Criteria BIM-based evaluation of architectural submittals %A Albukhari, I. %A Hegazy, T. %B International Journal of Mathematical Models and Methods in Applied Sciences %V 9 %P 453-462 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938384749&partnerID=40&md5=a7e5d8e9c68c6556317ba9b466af580e %0 Journal Article %J Journal of Management in Engineering %D 2014 %T Discussion of "ant colony optimization for multimode resource-constrained project scheduling" by Hong Zhang %A Menesi, W. %A Hegazy, T. %B Journal of Management in Engineering %V 30 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84898839449&doi=10.1061%2f%28ASCE%29ME.1943-5479.0000190&partnerID=40&md5=c252eb4d0a404aedd3c623f62b7148cb %R 10.1061/(ASCE)ME.1943-5479.0000190 %0 Journal Article %J Construction Management and Economics %D 2014 %T A microeconomic perspective on infrastructure rehabilitation %A Hegazy, T. %A Saad, D.A. %B Construction Management and Economics %V 32 %P 433-445 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84901253163&doi=10.1080%2f01446193.2013.879193&partnerID=40&md5=60807154de6e39ab866ccf6a70753b87 %R 10.1080/01446193.2013.879193 %0 Conference Paper %B Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress %D 2014 %T Microeconomics for infrastructure rehabilitation %A Saad, D.A. %A Hegazy, T. %B Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress %P 1279-1288 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84904704773&doi=10.1061%2f9780784413517.0131&partnerID=40&md5=f28fe3d3da90147ad24225e42e379735 %R 10.1061/9780784413517.0131 %0 Journal Article %J Journal of Performance of Constructed Facilities %D 2014 %T Multicriteria assessment and prioritization of hospital renewal needs %A Ali, A. %A Hegazy, T. %B Journal of Performance of Constructed Facilities %V 28 %P 528-538 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84901014697&doi=10.1061%2f%28ASCE%29CF.1943-5509.0000455&partnerID=40&md5=f6668f609595808c98b6351718590ccf %R 10.1061/(ASCE)CF.1943-5509.0000455 %0 Journal Article %J Journal of Construction Engineering and Management %D 2013 %T Enhancing construction as-built documentation using interactive voice response %A Abdel-Monem, M. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 139 %P 895-898 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84878820289&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000648&partnerID=40&md5=4745d2a0105cb6289f24d793805ffeba %R 10.1061/(ASCE)CO.1943-7862.0000648 %0 Journal Article %J Journal of Construction Engineering and Management %D 2013 %T Fast and near-optimum schedule optimization for large-scale projects %A Menesi, W. %A Golzarpoor, B. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 139 %P 1117-1124 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84882421991&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000722&partnerID=40&md5=244be15dc802cc2eabf142731edcd69c %R 10.1061/(ASCE)CO.1943-7862.0000722 %0 Journal Article %J Journal of Construction Engineering and Management %D 2013 %T Hands-on exercise for enhancing students' construction management skills %A Hegazy, T. %A Abdel-Monem, M. %A Saad, D.A. %A Rashedi, R. %B Journal of Construction Engineering and Management %V 139 %P 1135-1143 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84882374616&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000705&partnerID=40&md5=f7996ded5c35abb263b199d55ca5a1cc %R 10.1061/(ASCE)CO.1943-7862.0000705 %0 Journal Article %J Journal of Computing in Civil Engineering %D 2013 %T Large-scale asset renewal optimization using genetic algorithms plus segmentation %A Hegazy, T. %A Rashedi, R. %B Journal of Computing in Civil Engineering %V 27 %P 419-426 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84879074564&doi=10.1061%2f%28ASCE%29CP.1943-5487.0000249&partnerID=40&md5=eb35bca8bb210e5174eb61f9231a235a %R 10.1061/(ASCE)CP.1943-5487.0000249 %0 Journal Article %J Structure and Infrastructure Engineering %D 2012 %T Building asset management with deficiency tracking and integrated life cycle optimisation %A Elhakeem, A. %A Hegazy, T. %B Structure and Infrastructure Engineering %V 8 %P 729-738 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84859628648&doi=10.1080%2f15732471003777071&partnerID=40&md5=e560623dbcf42ccbafc46a5050ebafa6 %R 10.1080/15732471003777071 %0 Journal Article %J Journal of Construction Engineering and Management %D 2012 %T Closure to critical path segments scheduling technique by Tarek Hegazy and Wail Menesi %A Hegazy, T. %A Menesi, W. %B Journal of Construction Engineering and Management %V 138 %P 788-789 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84862122502&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000541&partnerID=40&md5=6dac471d9edf1479c201e29f323c6c67 %R 10.1061/(ASCE)CO.1943-7862.0000541 %0 Journal Article %J Automation in Construction %D 2012 %T Email-based system for documenting construction as-built details %A Hegazy, T. %A Abdel-Monem, M. %B Automation in Construction %V 24 %P 130-137 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84860296261&doi=10.1016%2fj.autcon.2012.02.014&partnerID=40&md5=a14fd0151b83a29cdcc86345a3982ed8 %R 10.1016/j.autcon.2012.02.014 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2012 %T Enhancing the critical path segments scheduling technique for project control %A Hegazy, T. %A Menesi, W. %B Canadian Journal of Civil Engineering %V 39 %P 968-977 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84865269360&doi=10.1139%2fL2012-024&partnerID=40&md5=07b627edcee0c27453d58e5f1e4a65d4 %R 10.1139/L2012-024 %0 Journal Article %J Journal of Construction Engineering and Management %D 2012 %T Heuristic method for satisfying both deadlines and resource constraints %A Hegazy, T. %A Menesi, W. %B Journal of Construction Engineering and Management %V 138 %P 688-696 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84862150950&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000483&partnerID=40&md5=69af329a29c77ec6dbc4d20eb6aa33a6 %R 10.1061/(ASCE)CO.1943-7862.0000483 %0 Journal Article %J Computer-Aided Civil and Infrastructure Engineering %D 2012 %T MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management %A Hegazy, T. %A Elhakeem, A. %A Singh Ahluwalia, S. %A Attalla, M. %B Computer-Aided Civil and Infrastructure Engineering %V 27 %P 130-142 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84855555964&doi=10.1111%2fj.1467-8667.2011.00729.x&partnerID=40&md5=a349e6ea47496e897c29f2c2f7bbb8c0 %R 10.1111/j.1467-8667.2011.00729.x %0 Journal Article %J Journal of Construction Engineering and Management %D 2011 %T Discussion of "time-profit trade-off analysis for construction projects" by Ahmed Senouci and Khaled El-Rayes %A Hegazy, T. %B Journal of Construction Engineering and Management %V 137 %P 96-97 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-78650399593&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000173&partnerID=40&md5=3cb2c379667d269da65a065d04b408ce %R 10.1061/(ASCE)CO.1943-7862.0000173 %0 Journal Article %J Automation in Construction %D 2011 %T Incorporating rework into construction schedule analysis %A Hegazy, T. %A Said, M. %A Kassab, M. %B Automation in Construction %V 20 %P 1051-1059 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-80053638754&doi=10.1016%2fj.autcon.2011.04.006&partnerID=40&md5=bd685bd38a14fa6fb8d21cdd5923d11a %R 10.1016/j.autcon.2011.04.006 %0 Journal Article %J Structure and Infrastructure Engineering %D 2011 %T Multi-criteria decision analysis for infrastructure privatisation using conflict resolution %A Kassab, M. %A Hipel, K. %A Hegazy, T. %B Structure and Infrastructure Engineering %V 7 %P 661-671 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-79957940920&doi=10.1080%2f15732470802677649&partnerID=40&md5=c1003344bde87b5175edd255f8d659f5 %R 10.1080/15732470802677649 %0 Journal Article %J Canadian Journal of Civil Engineering %D 2011 %T Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization %A Hegazy, T. %A Elhakeem, A. %B Canadian Journal of Civil Engineering %V 38 %P 263-271 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-79953878385&doi=10.1139%2fL10-134&partnerID=40&md5=392cc310a2c02cdc30316f09ff4e2157 %R 10.1139/L10-134 %0 Journal Article %J Journal of Professional Issues in Engineering Education and Practice %D 2011 %T Prospects of mind maps for better visualization of infrastructure literature %A Hegazy, T. %A Ali, A. %A Abdel-Monem, M. %B Journal of Professional Issues in Engineering Education and Practice %V 137 %P 239-247 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-81855166775&doi=10.1061%2f%28ASCE%29EI.1943-5541.0000072&partnerID=40&md5=9eff445673f608f53eda97249efc9b2a %R 10.1061/(ASCE)EI.1943-5541.0000072 %0 Journal Article %J Journal of Management in Engineering %D 2010 %T Attitude-based negotiation methodology for the management of construction disputes %A Yousefi, S. %A Hipel, K.W. %A Hegazy, T. %B Journal of Management in Engineering %V 26 %P 114-122 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-77953585910&doi=10.1061%2f%28ASCE%29ME.1943-5479.0000013&partnerID=40&md5=a653cc08c8051b6330f6a09f2ef0dbe6 %R 10.1061/(ASCE)ME.1943-5479.0000013 %0 Journal Article %J Journal of Construction Engineering and Management %D 2010 %T Computerized DSS for construction conflict resolution under uncertainty %A Kassab, M. %A Hegazy, T. %A Hipel, K. %B Journal of Construction Engineering and Management %V 136 %P 1249-1257 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-78649269214&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000239&partnerID=40&md5=32ae193cc4f6c22aec59406bdecfc71b %R 10.1061/(ASCE)CO.1943-7862.0000239 %0 Journal Article %J Journal of Construction Engineering and Management %D 2010 %T Critical path segments scheduling technique %A Hegazy, T. %A Menesi, W. %B Journal of Construction Engineering and Management %V 136 %P 1078-1085 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-77956817791&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000212&partnerID=40&md5=b346d0034e227b8935454b84a660be82 %R 10.1061/(ASCE)CO.1943-7862.0000212 %0 Journal Article %J Journal of Construction Engineering and Management %D 2010 %T Discussion of "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 136 %P 717-718 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-77952949435&doi=10.1061%2f%28ASCE%29CO.1943-7862.0000075&partnerID=40&md5=7744d494fe6ba5079d236ca99843a4c9 %R 10.1061/(ASCE)CO.1943-7862.0000075 %0 Journal Article %J Journal of Retail and Leisure Property %D 2010 %T Roof deterioration and impact: A questionnaire survey %A Ahluwalia, S.S. %A Hegazy, T. %B Journal of Retail and Leisure Property %V 9 %P 337-348 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-78649749728&doi=10.1057%2frlp.2010.18&partnerID=40&md5=580ad55ee20550162545d2a176ed128f %R 10.1057/rlp.2010.18 %0 Journal Article %J Journal of Facilities Management %D 2010 %T Two condition indicators for building components based on reactive-maintenance data %A Hegazy, T. %A Singh Ahluwalia, S. %A Attalla, M. %B Journal of Facilities Management %V 8 %P 64-74 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84993110026&doi=10.1108%2f14725961011019085&partnerID=40&md5=b48126b329a30ebf41f07a9f916da6ba %R 10.1108/14725961011019085 %0 Journal Article %J Journal of Bridge Engineering %D 2009 %T Integrated multiple-element bridge management system %A Elbehairy, H. %A Hegazy, T. %A Soudki, K. %B Journal of Bridge Engineering %V 14 %P 179-187 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-65249112794&doi=10.1061%2f%28ASCE%291084-0702%282009%2914%3a3%28179%29&partnerID=40&md5=5953c124f1d5f06bb2dbba56922a0425 %R 10.1061/(ASCE)1084-0702(2009)14:3(179) %0 Conference Paper %B AACE International Transactions %D 2008 %T Delay analysis considering dynamic resource allocation and multiple baselines %A Hegazy, T.M. %A Menesi, W. %B AACE International Transactions %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0 %0 Journal Article %J Journal of Construction Engineering and Management %D 2008 %T Delay analysis under multiple baseline updates %A Hegazy, T. %A Menesi, W. %B Journal of Construction Engineering and Management %V 134 %P 575-582 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-47749097935&doi=10.1061%2f%28ASCE%290733-9364%282008%29134%3a8%28575%29&partnerID=40&md5=00791deead71fb529682d832d2e03e1a %R 10.1061/(ASCE)0733-9364(2008)134:8(575) %0 Journal Article %J Journal of Construction Engineering and Management %D 2008 %T Efficient repetitive scheduling for high-rise construction %A Hegazy, T. %A Kamarah, E. %B Journal of Construction Engineering and Management %V 134 %P 253-264 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-40849150750&doi=10.1061%2f%28ASCE%290733-9364%282008%29134%3a4%28253%29&partnerID=40&md5=4ac6d27efb25049be77d0c67b3594635 %R 10.1061/(ASCE)0733-9364(2008)134:4(253) %0 Journal Article %J Journal of Construction Engineering and Management %D 2008 %T System of multiple ANNs for online planning of numerous building improvements %A Yousefi, S. %A Hegazy, T. %A Capuru̧o, R.A.C. %A Attalla, M. %B Journal of Construction Engineering and Management %V 134 %P 342-351 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-42549145854&doi=10.1061%2f%28ASCE%290733-9364%282008%29134%3a5%28342%29&partnerID=40&md5=05389b9bea8bb7fd962614ec66130532 %R 10.1061/(ASCE)0733-9364(2008)134:5(342) %0 Conference Paper %B AACE International Transactions %D 2007 %T Delay analysis under multiple baseline updates %A Hegazy, T.M. %A Menesi, W. %B AACE International Transactions %P CDR.19.1-CDR.19.8 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe %0 Conference Paper %B Congress on Computing in Civil Engineering, Proceedings %D 2007 %T Multiple criteria decision support for infrastructure privatization %A Kassab, M. %A Hegazy, T. %A Hipel, K.W. %B Congress on Computing in Civil Engineering, Proceedings %P 558-565 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-84891331851&doi=10.1061%2f40937%28261%2966&partnerID=40&md5=e228abf404cd3305cebbda8b90e5a60e %R 10.1061/40937(261)66 %0 Conference Paper %B Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics %D 2007 %T Negotiation characteristics in brownfield redevelopment projects %A Yousefi, S. %A Hipel, K.W. %A Hegazy, T. %A Witmer, J.A. %A Gray, P. %B Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics %P 1866-1871 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-40949088544&doi=10.1109%2fICSMC.2007.4414193&partnerID=40&md5=8da26169f68c1b520aa60e9372995163 %R 10.1109/ICSMC.2007.4414193 %0 Conference Paper %B Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics %D 2007 %T Uncertainty analysis in construction conflict resolution using information-gap theory %A Kassab, M. %A Hipel, K.W. %A Hegazy, T. %B Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics %P 1842-1847 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-40949083015&doi=10.1109%2fICSMC.2007.4414041&partnerID=40&md5=3ea78bc9c0ec540cceb63c948fdd7867 %R 10.1109/ICSMC.2007.4414041 %0 Journal Article %J Solid Mechanics and its Applications %D 2006 %T Better visualization for multiple-site infrastructure programs using GIS %A Hegazy, T. %B Solid Mechanics and its Applications %V 140 %P 793-800 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-81855202862&doi=10.1007%2f1-4020-4891-2_67&partnerID=40&md5=88bdf57b177513afe221e52f0883856e %R 10.1007/1-4020-4891-2_67 %0 Journal Article %J Computer-Aided Civil and Infrastructure Engineering %D 2006 %T Comparison of two evolutionary algorithms for optimization of bridge deck repairs %A Elbehairy, H. %A Elbeltagi, E. %A Hegazy, T. %A Soudki, K. %B Computer-Aided Civil and Infrastructure Engineering %V 21 %P 561-572 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-33748325851&doi=10.1111%2fj.1467-8667.2006.00458.x&partnerID=40&md5=7299f26689208ae0ea7d169135723394 %R 10.1111/j.1467-8667.2006.00458.x %0 Journal Article %J Journal of Construction Engineering and Management %D 2006 %T Computerized system for efficient delivery of infrastructure maintenance/repair programs %A Hegazy, T. %B Journal of Construction Engineering and Management %V 132 %P 26-34 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-33645500682&doi=10.1061%2f%28ASCE%290733-9364%282006%29132%3a1%2826%29&partnerID=40&md5=55a950134d84acc16e8db2f8cc0a1cca %R 10.1061/(ASCE)0733-9364(2006)132:1(26) %0 Journal Article %J Journal of Construction Engineering and Management %D 2006 %T Conflict resolution in construction disputes using the graph model %A Kassab, M. %A Hipel, K. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 132 %P 1043-1052 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-33748784871&doi=10.1061%2f%28ASCE%290733-9364%282006%29132%3a10%281043%29&partnerID=40&md5=c44e029916b7ef58ea99f37323337e29 %R 10.1061/(ASCE)0733-9364(2006)132:10(1043) %0 Journal Article %J Cost Engineering (Morgantown, West Virginia) %D 2006 %T Simplified project management for construction practitioners %A Hegazy, T. %B Cost Engineering (Morgantown, West Virginia) %V 48 %P 20-28 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a %0 Conference Paper %B Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress %D 2005 %T Apportioning concurrent delays and accelerations using daily windows %A Zhang, K. %A Hegazy, T. %B Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress %P 787-796 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b %0 Journal Article %J Journal of Infrastructure Systems %D 2005 %T Closure to “reconstruction of the building infrastructure: Two performance prediction models” %A Hegazy, T. %B Journal of Infrastructure Systems %V 11 %P 269-269 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-85001720300&doi=10.1061%2f%28ASCE%291076-0342%282005%2911%3a4%28269%29&partnerID=40&md5=a5dc6694f47d8ec686a06c9883348c4b %R 10.1061/(ASCE)1076-0342(2005)11:4(269) %0 Journal Article %J Advanced Engineering Informatics %D 2005 %T Comparison among five evolutionary-based optimization algorithms %A Elbeltagi, E. %A Hegazy, T. %A Grierson, D. %B Advanced Engineering Informatics %V 19 %P 43-53 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-22344432656&doi=10.1016%2fj.aei.2005.01.004&partnerID=40&md5=bfac770e5c10accfd76860aa63d2d024 %R 10.1016/j.aei.2005.01.004 %0 Journal Article %J Journal of Construction Engineering and Management %D 2005 %T Daily windows delay analysis %A Hegazy, T. %A Zhang, K. %B Journal of Construction Engineering and Management %V 131 %P 505-512 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-18744411578&doi=10.1061%2f%28ASCE%290733-9364%282005%29131%3a5%28505%29&partnerID=40&md5=ff5380dc11d994e60a5edf43fa170dd6 %R 10.1061/(ASCE)0733-9364(2005)131:5(505) %0 Journal Article %J Journal of Infrastructure Systems %D 2005 %T Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas %A Minocha, V.K. %A Hegazy, T. %B Journal of Infrastructure Systems %V 11 %P 268-269 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-28844507241&doi=10.1061%2f%28ASCE%291076-0342%282005%2911%3a4%28268%29&partnerID=40&md5=d1fcf2bf296ef507f0d16f2b70942e27 %R 10.1061/(ASCE)1076-0342(2005)11:4(268) %0 Conference Paper %B Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering %D 2005 %T Evolutionary algorithms for optimizing bridge deck rehabilitation %A Elbeltagi, E. %A Elbehairy, H. %A Hegazy, T. %A Grierson, D. %B Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering %P 619-630 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04 %0 Journal Article %J Journal of Construction Engineering and Management %D 2005 %T Graphical approach for manpower planning in infrastructure networks %A Elhakeem, A. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 131 %P 168-175 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-12744265205&doi=10.1061%2f%28ASCE%290733-9364%282005%29131%3a2%28168%29&partnerID=40&md5=5fe6e88f38668886768e5ac2b6d8cb26 %R 10.1061/(ASCE)0733-9364(2005)131:2(168) %0 Journal Article %J Journal of Construction Engineering and Management %D 2005 %T Modified but-for method for delay analysis %A Mbabazi, A. %A Hegazy, T. %A Saccomanno, F. %B Journal of Construction Engineering and Management %V 131 %P 1142-1144 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-26644452540&doi=10.1061%2f%28ASCE%290733-9364%282005%29131%3a10%281142%29&partnerID=40&md5=2199a7aa01bd192d799b10e19e71aea4 %R 10.1061/(ASCE)0733-9364(2005)131:10(1142) %0 Journal Article %J Journal of Construction Engineering and Management %D 2004 %T Distributed scheduling model for infrastructure networks %A Hegazy, T. %A Elhakeem, A. %A Elbeltagi, E. %B Journal of Construction Engineering and Management %V 130 %P 160-167 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-12744251346&doi=10.1061%2f%28ASCE%290733-9364%282004%29130%3a2%28160%29&partnerID=40&md5=97122bdd93cef6387e6cba1a0fb2cc82 %R 10.1061/(ASCE)0733-9364(2004)130:2(160) %0 Journal Article %J Journal of Construction Engineering and Management %D 2004 %T Dynamic layout of construction temporary facilities considering safety %A Elbeltagi, E. %A Hegazy, T. %A Eldosouky, A. %B Journal of Construction Engineering and Management %V 130 %P 534-541 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-13944281386&doi=10.1061%2f%28ASCE%290733-9364%282004%29130%3a4%28534%29&partnerID=40&md5=13a3869b3e02a40456b32226dc3ec09b %R 10.1061/(ASCE)0733-9364(2004)130:4(534) %0 Journal Article %J Journal of Management in Engineering %D 2004 %T In-house delivery of multiple-small reconstruction projects %A Attalla, M. %A Hegazy, T. %A Elbeltagi, E. %B Journal of Management in Engineering %V 20 %P 25-31 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-14744296164&doi=10.1061%2f%28ASCE%290742-597X%282004%2920%3a1%2825%29&partnerID=40&md5=a808e20f4178ae4fe8944b57d4296df4 %R 10.1061/(ASCE)0742-597X(2004)20:1(25) %0 Journal Article %J Journal of Construction Engineering and Management %D 2003 %T Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson %A Morcous, G. %A Hegazy, T. %B Journal of Construction Engineering and Management %V 129 %P 470-471 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-13944273417&doi=10.1061%2f%28ASCE%290733-9364%282003%29129%3a4%28470%29&partnerID=40&md5=4b84257cfa95057b195fd22145fb6f5e %R 10.1061/(ASCE)0733-9364(2003)129:4(470) %0 Journal Article %J Journal of Construction Engineering and Management %D 2003 %T Genetic optimization for dynamic project control %A Hegazy, T. %A Petzold, K. %B Journal of Construction Engineering and Management %V 129 %P 396-404 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-13944255840&doi=10.1061%2f%28ASCE%290733-9364%282003%29129%3a4%28396%29&partnerID=40&md5=93c2b055cf48e064eef7b7e011f51810 %R 10.1061/(ASCE)0733-9364(2003)129:4(396) %0 Journal Article %J Journal of Infrastructure Systems %D 2003 %T Reconstruction of the building infrastructure: Two performance prediction models %A Attalla, M. %A Hegazy, T. %A Haas, R. %B Journal of Infrastructure Systems %V 9 %P 26-34 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0037343247&doi=10.1061%2f%28ASCE%291076-0342%282003%299%3a1%2826%29&partnerID=40&md5=2169871f93f8f5fc26ecf9c51591a295 %R 10.1061/(ASCE)1076-0342(2003)9:1(26) %0 Journal Article %J Journal of Construction Engineering and Management %D 2003 %T Resource optimization using combined simulation and genetic algorithms %A Hegazy, T. %A Kassab, M. %B Journal of Construction Engineering and Management %V 129 %P 698-705 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-6344281398&doi=10.1061%2f%28ASCE%290733-9364%282003%29129%3a6%28698%29&partnerID=40&md5=1004c288c7def27f8d803859b92169c0 %R 10.1061/(ASCE)0733-9364(2003)129:6(698) %0 Journal Article %J Cost Engineering (Morgantown, West Virginia) %D 2003 %T Success of reconstruction projects: A statistical investigation %A Attalla, M. %A Hegazy, T. %B Cost Engineering (Morgantown, West Virginia) %V 45 %P 25-31 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-75849131453&partnerID=40&md5=ecb35253b7725a7806f9f4550319f1b7 %0 Journal Article %J Journal of Construction Engineering and Management %D 2001 %T Cost optimization in projects with repetitive nonserial activities %A Hegazy, T. %A Wassef, N. %B Journal of Construction Engineering and Management %V 127 %P 183-191 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035335808&doi=10.1061%2f%28ASCE%290733-9364%282001%29127%3a3%28183%29&partnerID=40&md5=4059fc98a3261063dfd3a76922a51920 %R 10.1061/(ASCE)0733-9364(2001)127:3(183) %0 Journal Article %J Computer-Aided Civil and Infrastructure Engineering %D 2001 %T A hybrid-based system for site layout planning in construction %A Elbeltagi, E. %A Hegazy, T. %B Computer-Aided Civil and Infrastructure Engineering %V 16 %P 79-93 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c %0 Journal Article %J Journal of Construction Engineering and Management %D 2001 %T Improving design coordination for building projects. I: Information model %A Hegazy, T. %A Zaneldin, E. %A Grierson, D. %B Journal of Construction Engineering and Management %V 127 %P 322-329 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035392368&doi=10.1061%2f%28ASCE%290733-9364%282001%29127%3a4%28322%29&partnerID=40&md5=35bc5595e502e0b17d674446256b7106 %R 10.1061/(ASCE)0733-9364(2001)127:4(322) %0 Journal Article %J Journal of Construction Engineering and Management %D 2001 %T Improving design coordination for building projects. II: A collaborative system %A Zaneldin, E. %A Hegazy, T. %A Grierson, D. %B Journal of Construction Engineering and Management %V 127 %P 330-336 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035392529&doi=10.1061%2f%28ASCE%290733-9364%282001%29127%3a4%28330%29&partnerID=40&md5=812895b7d70faf4b7ab2b1d3de38e70c %R 10.1061/(ASCE)0733-9364(2001)127:4(330) %0 Journal Article %J Journal of Construction Engineering and Management %D 2001 %T Simplified spreadsheet solutions: I: Subcontractor information system %A Hegazy, T. %A Ersahin, T. %B Journal of Construction Engineering and Management %V 127 %P 461-468 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035509946&doi=10.1061%2f%28ASCE%290733-9364%282001%29127%3a6%28461%29&partnerID=40&md5=d4c921987ff167cd8228a3bd039d5bc1 %R 10.1061/(ASCE)0733-9364(2001)127:6(461) %0 Journal Article %J Journal of Construction Engineering and Management %D 2001 %T Simplified spreadsheet solutions. II: Overall schedule optimization %A Hegazy, T. %A Ersahin, T. %B Journal of Construction Engineering and Management %V 127 %P 469-475 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035509424&doi=10.1061%2f%28ASCE%290733-9364%282001%29127%3a6%28469%29&partnerID=40&md5=2b53e3366149ab1ca0bace897c04cdf5 %R 10.1061/(ASCE)0733-9364(2001)127:6(469) %0 Journal Article %J Journal of Construction Engineering and Management %D 2000 %T Algorithm for scheduling with multiskilled constrained resources %A Hegazy, T. %A Shabeeb, A.K. %A Elbeltagi, E. %A Cheema, T. %B Journal of Construction Engineering and Management %V 126 %P 414-421 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034321183&doi=10.1061%2f%28ASCE%290733-9364%282000%29126%3a6%28414%29&partnerID=40&md5=be3fe77135ea0cce5c12e936dc4d6aee %R 10.1061/(ASCE)0733-9364(2000)126:6(414) %0 Conference Paper %B Proceedings of the American Control Conference %D 2000 %T Computational intelligence tools for solving the facilities layout planning problem %A Karray, Fakhri %A Zaneldin, Essam %A Hegazy, Tarek %A Shabeeb, Abdulkarim %A Elbeltagi, Emad %B Proceedings of the American Control Conference %V 6 %P 3954-3958 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911 %0 Journal Article %J Journal of Construction Engineering and Management %D 2000 %T Project performance control in reconstruction projects %A McKim, R. %A Hegazy, T. %A Attalla, M. %B Journal of Construction Engineering and Management %V 126 %P 137-141 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0033690431&doi=10.1061%2f%28ASCE%290733-9364%282000%29126%3a2%28137%29&partnerID=40&md5=bf7379039ad27496194140194f566796 %R 10.1061/(ASCE)0733-9364(2000)126:2(137) %0 Journal Article %J Journal of Computing in Civil Engineering %D 1999 %T EvoSite: Evolution-based model for site layout planning %A Hegazy, T. %A Elbeltagi, E. %B Journal of Computing in Civil Engineering %V 13 %P 198-206 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0033156961&doi=10.1061%2f%28ASCE%290887-3801%281999%2913%3a3%28198%29&partnerID=40&md5=ee540302a91ede1c25a29399a16b08d9 %R 10.1061/(ASCE)0887-3801(1999)13:3(198) %0 Conference Paper %B AACE International. Transactions of the Annual Meeting %D 1999 %T Genetic optimization of site layout planning %A Elbeltagi, Emad %A Hegazy, Tarek M. %B AACE International. Transactions of the Annual Meeting %P IT.05.1-IT.05.8 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91 %0 Journal Article %J Journal of Construction Engineering and Management %D 1999 %T Optimization of resource allocation and leveling using genetic algorithms %A Hegazy, T. %B Journal of Construction Engineering and Management %V 125 %P 167-175 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0032642926&doi=10.1061%2f%28ASCE%290733-9364%281999%29125%3a3%28167%29&partnerID=40&md5=461a2c255ca5c1b7ccf8932af908be1f %R 10.1061/(ASCE)0733-9364(1999)125:3(167) %0 Conference Paper %B AACE International. Transactions of the Annual Meeting %D 1998 %T Flowchart-based simulation of construction operations %A Zaneldin, Essam %A Hegazy, Tarek M. %B AACE International. Transactions of the Annual Meeting %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0031625658&partnerID=40&md5=29fc489dffdfdd95dff01c1c0574d621 %0 Conference Paper %B AACE International. Transactions of the Annual Meeting %D 1996 %T Expert rules-of-thumb for effective design coordination %A Hegazy, Tarek M. %A Khalifa, Jameel %B AACE International. Transactions of the Annual Meeting %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029708513&partnerID=40&md5=cc65b0632d54f6a529cc1d6de25701ca %0 Journal Article %J Cost Engineering (Morgantown, West Virginia) %D 1995 %T Elements of cost estimation: a survey in Canada and the United States %A Hegazy, Tarek %A Moselhi, Osama %B Cost Engineering (Morgantown, West Virginia) %V 37 %P 27-33 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029296896&partnerID=40&md5=edb2cfd356b1d37fab5639376ab51fc7 %0 Conference Paper %B Transactions of the American Association of Cost Engineers %D 1991 %T Practical cost estimation in a competitive environment %A Moselhi, Osama %A Hegazy, Tarek %A Fazio, Paul %B Transactions of the American Association of Cost Engineers %P H.5.1-H.5.9 %G eng %U https://www.scopus.com/inward/record.uri?eid=2-s2.0-0025846078&partnerID=40&md5=468b6a346233b1cb9623fbb570881cd5