%0 Thesis %B Journal of Construction Engineering and Management, 135 (3), pp. 187-198 %D 2009 %T Measuring the impact of rework on construction cost performance %A Hwang, B.G. %A Thomas, S.R. %A Haas, C.T. %A Caldas, C.H. %B Journal of Construction Engineering and Management, 135 (3), pp. 187-198 %G eng %U https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29