%0 Thesis %B ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198 %D 2009 %T Measuring the Impacts of Rework on Construction Cost Performance %A Hwang, B. %A Thomas, S. %A Haas, C. %A Caldas, C. %B ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198 %G eng